If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786010907020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.744414,"lon":-118.088519,"icon":""}]} |
Location: 02/07-09-078-01W6/0 | |
Location Alias: 02/07-09-78-01 W6M | |
Location Alias 2: 02/07-09-078-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 01 | |
Section: 09 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL BELLOY 7-9-78-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0216914 | |
License Date: 1998-08-10 | |
License Status: Suspension | |
Spud Date: 1998-08-26 | |
Final Drill Date: 1998-08-30 | |
Well Total Depth: 1023.00 m | |
Surface Hole Latitude: 55.744414 | |
Surface Hole Longitude: -118.088519 |
Date | Event |
---|---|
1998-08-10 | Obtained License |
1998-08-26 | Well Log Performed |
1998-08-27 | Surface Casing Operation Performed |
1998-08-30 | Drill Stem Test Performed |
1998-08-30 | Finished Drilling |
1998-08-30 | Well Log Performed |
1998-08-30 | Well Mode changed to Drilled and Cased |
1998-08-31 | Drill Stem Test Performed |
1998-09-01 | Production Casing Operation Performed |
1998-09-01 | Rig Released |
1998-09-13 | Perforation Treatment Performed - Jet Perforation |
1998-09-13 | Well Log Performed |
1998-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-14 | Perforation Treatment Performed - Jet Perforation |
1998-09-14 | Plug Back Performed |
1998-09-14 | Well Log Performed |
1998-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-15 | Perforation Treatment Performed - Jet Perforation |
1998-09-15 | Plug Back Performed |
1998-09-15 | Well Log Performed |
1998-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-16 | Perforation Treatment Performed - Jet Perforation |
1998-09-16 | Plug Back Performed |
1998-09-16 | Well Log Performed |
1998-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-17 | Perforation Treatment Performed - Jet Perforation |
1998-09-17 | Plug Back Performed |
1998-09-17 | Well Log Performed |
1998-09-18 | Perforation Treatment Performed - Jet Perforation |
1998-09-18 | Well Log Performed |
1999-01-22 | Well Began Production |
1999-01-22 | Well Fluid changed to Gas |
1999-01-22 | Well Mode changed to Flowing |
1999-01-23 | Well Fluid changed to Gas |
1999-01-23 | Well Mode changed to Flowing |
2005-02-01 | Well Fluid changed to Gas |
2005-02-01 | Well Mode changed to Suspended |
2005-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-22 | Plug Back Performed |
2005-10-22 | Well Fluid changed to Gas |
2005-10-22 | Well Log Performed |
2005-10-22 | Well Mode changed to Abandoned Zone |
2005-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-23 | Plug Back Performed |
2005-10-23 | Well Log Performed |
2005-10-25 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-09-13 | Perforation | 952.50 | 954.00 | 13 |
1998-09-18 | Perforation | 752.00 | 754.00 | 13 |
2005-10-22 | Packing Device Capped w/Cement | 775.00 | 783.00 | 0 |
2005-10-23 | Packing Device Capped w/Cement | 739.00 | 747.00 | 0 |
2005-10-25 | Perforation | 729.50 | 731.00 | 17 |
1998-09-14 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
1998-09-14 | Perforation | 856.00 | 859.00 | 13 |
1998-09-15 | Packing Device Capped w/Cement | 844.00 | 852.00 | 0 |
1998-09-15 | Perforation | 828.00 | 833.00 | 13 |
1998-09-16 | Packing Device Capped w/Cement | 817.00 | 825.00 | 0 |
1998-09-16 | Perforation | 807.50 | 809.50 | 13 |
1998-09-17 | Packing Device Capped w/Cement | 796.00 | 804.00 | 0 |
1998-09-17 | Perforation | 788.00 | 790.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 3610 | 0.0 | 0.0 | 0.0 |
2000 | 6848 | 0.0 | 0.0 | 0.0 |
2001 | 6955 | 0.0 | 0.0 | 0.0 |
2002 | 1428 | 0.0 | 0.0 | 0.0 |
For data sources see[5]