If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786012906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.788174,"lon":-118.119117,"icon":""}]} |
Location: 00/06-29-078-01W6/0 | |
Location Alias: 00/06-29-78-01 W6M | |
Location Alias 2: 00/06-29-078-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 01 | |
Section: 29 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL ET AL BELLOY 6-29-78-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0152338 | |
License Date: 1992-04-29 | |
License Status: Abandoned | |
Spud Date: 1992-05-05 | |
Final Drill Date: 1992-05-17 | |
Well Total Depth: 2182.00 m | |
Surface Hole Latitude: 55.788174 | |
Surface Hole Longitude: -118.119117 |
Date | Event |
---|---|
1992-04-29 | Obtained License |
1992-05-06 | Lost Circulation Occurred |
1992-05-07 | Surface Casing Operation Performed |
1992-05-08 | Lost Circulation Occurred |
1992-05-17 | Finished Drilling |
1992-05-17 | Well Log Performed |
1992-05-17 | Well Mode changed to Drilled and Cased |
1992-05-18 | Well Log Performed |
1992-05-19 | Well Log Performed |
1992-05-20 | Plug Back Performed |
1992-05-21 | Production Casing Operation Performed |
1992-05-21 | Rig Released |
1992-05-21 | Well Log Performed |
1992-05-22 | Well Log Performed |
1994-06-08 | Well Log Performed |
1994-06-09 | Perforation Treatment Performed - Jet Perforation |
1994-09-27 | Well Began Production |
1994-09-27 | Well Fluid changed to Gas |
1994-09-27 | Well Mode changed to Flowing |
2000-01-07 | Well Log Performed |
2000-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-09 | Perforation Treatment Performed - Jet Perforation |
2000-01-09 | Plug Back Performed |
2000-01-09 | Well Fluid changed to Gas |
2000-01-09 | Well Mode changed to Abandoned Zone |
2000-01-10 | Well Log Performed |
2000-01-11 | Perforation Treatment Performed - Jet Perforation |
2000-01-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-02 | Plug Back Performed |
2010-10-23 | Perforation Treatment Performed - Jet Perforation |
2010-11-01 | Perforation Treatment Performed - Jet Perforation |
2011-07-06 | Perforation Treatment Performed - Cement Plug |
2011-07-06 | Perforation Treatment Performed - Cement Squeeze |
2011-07-06 | Plug Back Performed |
2012-07-04 | Perforation Treatment Performed - Jet Perforation |
2012-07-05 | Perforation Treatment Performed - Cement Plug |
2012-07-05 | Perforation Treatment Performed - Remedial Casing |
2012-08-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-06-09 | Perforation | 557.00 | 558.10 | 13 |
2011-07-06 | Cement Plug | 535.00 | 554.00 | 0 |
2011-07-06 | Cement Squeeze | 514.00 | 515.50 | 0 |
2011-07-06 | Cement Plug | 438.20 | 533.00 | 0 |
2012-07-04 | Perforation | 391.00 | 393.00 | 20 |
2012-07-05 | Remedial Casing Cementing | 391.00 | 393.00 | 0 |
2012-07-05 | Cement Plug | 370.00 | 388.00 | 0 |
2000-01-09 | Packing Device Capped w/Cement | 542.00 | 550.00 | 0 |
2000-01-09 | Perforation | 514.00 | 515.00 | 18 |
2000-01-11 | Perforation | 515.50 | 515.50 | 20 |
2000-01-12 | Acid Treatment | 514.00 | 515.50 | 0 |
2007-08-02 | Packing Device Capped w/Cement | 496.00 | 504.00 | 0 |
2010-10-23 | Perforation | 514.00 | 515.50 | 17 |
2010-11-01 | Perforation | 557.00 | 558.10 | 17 |
2011-07-06 | Cement Squeeze | 557.00 | 558.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2298 | 0.0 | 0.0 | 0.0 |
1995 | 8528 | 0.0 | 0.0 | 0.0 |
1996 | 5833 | 0.0 | 0.0 | 0.0 |
1997 | 4142 | 0.0 | 0.0 | 0.0 |
1998 | 1125 | 0.0 | 0.0 | 0.0 |
1999 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1992-05-06 | Lost Circulation | 211.00 | 238.00 |
1992-05-08 | Lost Circulation | 613.00 | 1862.00 |
2012-07-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]