If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0786071303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.769189,"lon":-118.947641,"icon":""}]} |
| Location: 00/03-13-078-07W6/0 | |
| Location Alias: 00/03-13-78-07 W6M | |
| Location Alias 2: 00/03-13-078-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 078 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 13 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ VALHALLA 3-13-78-7 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0482580 | |
| License Date: 2017-01-25 | |
| License Status: Issued | |
| Spud Date: 2017-02-26 | |
| Final Drill Date: 2017-03-04 | |
| Well Total Depth: 3110.00 m | |
| Surface Hole Latitude: 55.769189 | |
| Surface Hole Longitude: -118.947641 |
| Date | Event |
|---|---|
| 2017-01-25 | Obtained License |
| 2017-02-26 | Surface Casing Operation Performed |
| 2017-02-28 | Direction Drilling Operation Performed - Deviate |
| 2017-03-01 | Direction Drilling Operation Performed - Horizontal |
| 2017-03-02 | Intermediate Casing Operation Performed |
| 2017-03-04 | Finished Drilling |
| 2017-03-04 | Well Log Performed |
| 2017-03-04 | Well Mode changed to Drilled and Cased |
| 2017-03-05 | Liner Casing Operation Performed |
| 2017-03-05 | Rig Released |
| 2017-03-24 | Well Log Performed |
| 2017-03-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-01 | Well Began Production |
| 2017-04-01 | Well Fluid changed to Crude Oil |
| 2017-04-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-02-26 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-02-28 | 1048.00 | Deviate (5 - 79 degrees) |
| 2017-03-01 | 1561.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-03-31 | Multi-Stage Fracture | 3084.50 | 3084.60 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2704.50 | 2704.60 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2657.60 | 2657.70 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2610.70 | 2610.80 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2564.00 | 2564.10 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2517.10 | 2517.20 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2470.40 | 2470.50 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2423.70 | 2423.80 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2377.10 | 2377.20 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2329.90 | 2330.00 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2283.00 | 2283.10 | 0 |
| 2017-03-31 | Multi-Stage Fracture | 3060.00 | 3060.10 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2235.90 | 2236.00 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2188.60 | 2188.70 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2141.50 | 2141.60 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2094.40 | 2094.50 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2047.10 | 2047.20 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1999.80 | 1999.90 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1954.20 | 1954.30 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1907.30 | 1907.40 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1860.50 | 1860.60 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1813.80 | 1813.90 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 3024.30 | 3024.40 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1766.90 | 1767.00 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1720.00 | 1720.10 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 1673.30 | 1673.40 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2988.00 | 2988.10 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2940.30 | 2940.40 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2893.10 | 2893.20 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2845.50 | 2845.60 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2799.00 | 2799.10 | 0 |
| 2017-04-01 | Multi-Stage Fracture | 2751.80 | 2751.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-03-31 | 2017-04-01 | 1,420 | 3,335 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 89.4107 | N/A | |||
| Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.19 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.19 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.19 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.19 | N/A | ||||
| Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.865 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 0.865 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 0.865 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 0.8648 | N/A | ||||
| SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.2666 | N/A | ||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 4.2666 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0995 | N/A | |
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0869 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0869 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0869 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0869 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0869 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0444 | N/A | |
| CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0364 | N/A | |
| Potassium Chloride | 7447-40-7 | 100 | 0.0364 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0364 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-03-31 | 2017-04-01 | Surface Water - Runoff | 3334 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 2794 | 0.0 | 0.0 | 0.0 |
| 2018 | 8461 | 0.0 | 0.0 | 0.0 |
| 2019 | 7100 | 0.0 | 0.0 | 0.0 |
| 2020 | 838 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-04 | No Incident Encountered | 0.00 | 0.00 |
| 2017-04-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]