X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786072201000

Well Details

Well ID: 0786072201000
Loading map...
Location: 00/01-22-078-07W6/0
Location Alias: 00/01-22-78-07 W6M
Location Alias 2: 00/01-22-078-07 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 07
Section: 22
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 1-22-78-7
Operator Name: Tourmaline Oil Corp.
License Number: 0477708
License Date: 2015-11-16
License Status: Amended
Spud Date: 2016-02-06
Final Drill Date: 2016-02-26
Well Total Depth: 3221.00 m
Surface Hole Latitude: 55.750452
Surface Hole Longitude: -118.989458

For data sources see[1][2]

Well History

Date Event
2015-11-16 Obtained License
2016-02-07 Surface Casing Operation Performed
2016-02-19 Direction Drilling Operation Performed - Deviate
2016-02-21 Direction Drilling Operation Performed - Horizontal
2016-02-22 Intermediate Casing Operation Performed
2016-02-26 Finished Drilling
2016-02-26 Well Log Performed
2016-02-26 Well Mode changed to Drilled and Cased
2016-02-27 Liner Casing Operation Performed
2016-02-27 Rig Released
2016-03-04 Well Log Performed
2016-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-14 Well Began Production
2016-03-14 Well Fluid changed to Crude Oil
2016-03-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-02-06 Precision Drilling Corporation 226 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-02-19 1156.00 Deviate (5 - 79 degrees)
2016-02-21 1690.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-03-07 Multi-Stage Fracture 3207.00 3207.10 0
2016-03-07 Multi-Stage Fracture 2738.90 2739.00 0
2016-03-07 Multi-Stage Fracture 2680.00 2680.10 0
2016-03-07 Multi-Stage Fracture 2621.50 2621.60 0
2016-03-07 Multi-Stage Fracture 2563.80 2563.90 0
2016-03-07 Multi-Stage Fracture 2505.20 2505.30 0
2016-03-07 Multi-Stage Fracture 2446.10 2446.20 0
2016-03-07 Multi-Stage Fracture 2387.10 2387.20 0
2016-03-07 Multi-Stage Fracture 2328.00 2328.10 0
2016-03-07 Multi-Stage Fracture 2270.00 2270.10 0
2016-03-07 Multi-Stage Fracture 2211.40 2211.50 0
2016-03-07 Acid Treatment 3207.00 3207.10 0
2016-03-07 Multi-Stage Fracture 2153.20 2153.30 0
2016-03-07 Multi-Stage Fracture 2096.30 2096.40 0
2016-03-07 Multi-Stage Fracture 2037.90 2038.00 0
2016-03-07 Multi-Stage Fracture 1978.80 1978.90 0
2016-03-07 Multi-Stage Fracture 1919.80 1919.90 0
2016-03-07 Multi-Stage Fracture 1860.80 1860.90 0
2016-03-07 Multi-Stage Fracture 1802.30 1802.40 0
2016-03-07 Multi-Stage Fracture 1743.30 1743.40 0
2016-03-07 Multi-Stage Fracture 3148.00 3148.10 0
2016-03-07 Multi-Stage Fracture 3089.40 3089.50 0
2016-03-07 Multi-Stage Fracture 3030.70 3030.80 0
2016-03-07 Multi-Stage Fracture 2971.70 2971.80 0
2016-03-07 Multi-Stage Fracture 2912.60 2912.70 0
2016-03-07 Multi-Stage Fracture 2856.50 2856.60 0
2016-03-07 Multi-Stage Fracture 2797.80 2797.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-07 2016-03-07 1,472 4,178 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.7335 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 4.9938 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.9151 N/A
SiberProp 20/40 Trican silica crystalline 14808-60-7 100 6.0525 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.013 N/A
dibromoacetonitrile 3252-43-5 100 0.013 N/A
non-hazardous ingredients Not Available 100 0.013 N/A
polyethylene glycol 25322-68-3 100 0.013 N/A
sodium bromide 7647-15-6 100 0.013 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0973 N/A
water Not Available 100 0.0973 N/A
Third Party Fluid (L) Trican Energizing Fluid undisclosed Trade Secret 100 0.0189 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0855 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0855 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0855 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0855 N/A
non-hazardous ingredients Not Available 100 0.0855 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0457 N/A
non-hazardous ingredients Not Available 100 0.0457 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0442 N/A
methanol 67-56-1 100 0.0442 N/A
water Not Available 100 0.0442 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-03-07 2016-03-07 Surface Water - Runoff 4178
2016-03-05 2016-03-05 Surface Water - Runoff 60
2016-03-08 2016-03-08 Surface Water - Runoff 220

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6479 0.0 0.0 0.0
2017 7661 0.0 0.0 0.0
2018 8474 0.0 0.0 0.0
2019 8661 0.0 0.0 0.0
2020 2050 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-01 No Incident Encountered 0.00 0.00
2016-03-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References