If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0786072806030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.7661,"lon":-119.032496,"icon":""}]} |
| Location: 03/06-28-078-07W6/0 | |
| Location Alias: 03/06-28-78-07 W6M | |
| Location Alias 2: 03/06-28-078-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 078 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 28 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE 103 VALHALLA 6-28-78-7 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0481231 | |
| License Date: 2016-11-04 | |
| License Status: Issued | |
| Spud Date: 2016-12-04 | |
| Final Drill Date: 2016-12-14 | |
| Well Total Depth: 3634.00 m | |
| Surface Hole Latitude: 55.766100 | |
| Surface Hole Longitude: -119.032496 |
| Date | Event |
|---|---|
| 2016-11-04 | Obtained License |
| 2016-12-05 | Surface Casing Operation Performed |
| 2016-12-07 | Direction Drilling Operation Performed - Deviate |
| 2016-12-08 | Direction Drilling Operation Performed - Horizontal |
| 2016-12-08 | Well Log Performed |
| 2016-12-09 | Intermediate Casing Operation Performed |
| 2016-12-14 | Finished Drilling |
| 2016-12-14 | Well Log Performed |
| 2016-12-14 | Well Mode changed to Drilled and Cased |
| 2016-12-15 | Liner Casing Operation Performed |
| 2016-12-15 | Rig Released |
| 2017-01-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-08 | Well Began Production |
| 2017-02-08 | Well Fluid changed to Crude Oil |
| 2017-02-08 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-12-04 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-12-07 | 1091.40 | Deviate (5 - 79 degrees) |
| 2016-12-08 | 1753.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-01-07 | Multi-Stage Fracture | 3609.40 | 3609.50 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2992.20 | 2992.30 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2922.90 | 2923.00 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2852.90 | 2853.00 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2783.20 | 2783.30 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2713.50 | 2713.60 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2643.40 | 2643.50 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2573.40 | 2573.50 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2503.30 | 2503.40 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2433.00 | 2433.10 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 2362.90 | 2363.00 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3551.70 | 3551.80 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 2293.30 | 2293.40 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 2223.20 | 2223.30 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 2153.10 | 2153.20 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 2083.10 | 2083.20 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 2013.00 | 2013.10 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 1943.00 | 1943.10 | 0 |
| 2017-01-08 | Multi-Stage Fracture | 1861.60 | 1861.70 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3481.60 | 3481.70 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3411.50 | 3411.60 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3341.60 | 3341.70 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3271.50 | 3271.60 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3201.30 | 3201.40 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3131.90 | 3132.00 | 0 |
| 2017-01-07 | Multi-Stage Fracture | 3061.80 | 3061.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-01-07 | 2017-01-08 | 1,470 | 3,959 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 87.7562 | N/A | |||
| Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.7122 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.7122 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.7122 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.7121 | N/A | ||||
| Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.1557 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.1557 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.1557 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.1557 | N/A | ||||
| SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 5.1121 | N/A | ||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 5.1121 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0969 | N/A | |
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0847 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0847 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0847 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0847 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0847 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0469 | N/A | |
| CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0349 | N/A | |
| Potassium Chloride | 7447-40-7 | 100 | 0.0349 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0349 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-01-08 | 2017-01-08 | Surface Water - Runoff | 3963 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 6775 | 0.0 | 0.0 | 0.0 |
| 2018 | 7831 | 0.0 | 0.0 | 0.0 |
| 2019 | 8709 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-12-14 | No Incident Encountered | 0.00 | 0.00 |
| 2017-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]