X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110814020

Well Details

Well ID: 0786110814020
Loading map...
Location: 02/14-08-078-11W6/0
Location Alias: 02/14-08-78-11 W6M
Location Alias 2: 02/14-08-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 08
County/Municipality: Saddle Hills County
Well Name: KELT EXP 102 HZ PCOUPES 14-8-78-11
Operator Name: Kelt Exploration Ltd.
License Number: 0469056
License Date: 2014-08-12
License Status: Issued
Spud Date: 2014-08-18
Final Drill Date: 2014-09-06
Well Total Depth: 4155.00 m
Surface Hole Latitude: 55.736818
Surface Hole Longitude: -119.651107

For data sources see[1][2]

Well History

Date Event
2014-08-12 Obtained License
2014-08-20 Surface Casing Operation Performed
2014-08-25 Direction Drilling Operation Performed - Deviate
2014-08-29 Direction Drilling Operation Performed - Horizontal
2014-09-06 Finished Drilling
2014-09-06 Well Mode changed to Drilled and Cased
2014-09-07 Well Log Performed
2014-09-12 Perforation Treatment Performed - Open-Hole Completion
2014-09-12 Production Casing Operation Performed
2014-09-12 Rig Released
2014-11-10 Well Log Performed
2014-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-26 Well Began Production
2014-11-26 Well Fluid changed to Crude Oil
2014-11-26 Well Mode changed to Flowing
2018-02-01 Well Fluid changed to Crude Oil
2018-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-18 Beaver Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-25 2007.50 Deviate (5 - 79 degrees)
2014-08-29 2314.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-12 Open Hole/Barefoot Completion 4148.00 4155.00 0
2014-11-13 Multi-Stage Fracture 3666.70 3667.60 0
2014-11-13 Multi-Stage Fracture 3598.60 3599.40 0
2014-11-13 Multi-Stage Fracture 3543.00 3543.90 0
2014-11-13 Multi-Stage Fracture 3474.80 3475.70 0
2014-11-13 Multi-Stage Fracture 3406.70 3407.50 0
2014-11-13 Multi-Stage Fracture 3338.50 3339.30 0
2014-11-14 Multi-Stage Fracture 3283.00 3283.80 0
2014-11-14 Multi-Stage Fracture 3202.10 3202.90 0
2014-11-14 Multi-Stage Fracture 3146.60 3147.40 0
2014-11-14 Multi-Stage Fracture 3078.40 3079.20 0
2014-11-12 Multi-Stage Fracture 4138.50 4139.80 0
2014-11-14 Multi-Stage Fracture 3022.80 3023.60 0
2014-11-14 Multi-Stage Fracture 2967.20 2968.00 0
2014-11-14 Multi-Stage Fracture 2899.00 2899.80 0
2014-11-14 Multi-Stage Fracture 2843.40 2844.20 0
2014-11-14 Multi-Stage Fracture 2775.10 2776.00 0
2014-11-14 Multi-Stage Fracture 2706.90 2707.70 0
2014-11-14 Multi-Stage Fracture 2651.30 2652.20 0
2014-11-14 Multi-Stage Fracture 2595.80 2596.60 0
2014-11-15 Multi-Stage Fracture 2527.50 2528.30 0
2014-11-15 Multi-Stage Fracture 2472.00 2472.80 0
2014-11-12 Multi-Stage Fracture 4093.00 4093.90 0
2014-11-15 Multi-Stage Fracture 2403.80 2404.60 0
2014-11-15 Multi-Stage Fracture 2360.90 2361.80 0
2014-11-12 Multi-Stage Fracture 4050.40 4051.20 0
2014-11-12 Multi-Stage Fracture 3969.70 3970.50 0
2014-11-12 Multi-Stage Fracture 3914.10 3915.00 0
2014-11-13 Multi-Stage Fracture 3846.00 3846.80 0
2014-11-13 Multi-Stage Fracture 3790.50 3791.30 0
2014-11-13 Multi-Stage Fracture 3722.30 3723.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-12 2014-11-15 2,216 10,249 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.0601 N/A
Prime Plus (30/50) Canyon No specific ingredients Not Available 100 1.2417 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 7.5671 N/A
Crystalline silica. quartz 14808-60-7 100 7.5671 N/A
Iron Oxide 1309-37-1 100 7.5671 N/A
Titanium Oxide 13463-67-7 100 7.5671 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 3.955 N/A
Crystalline silica. quartz 14808-60-7 100 3.955 N/A
Iron Oxide 1309-37-1 100 3.955 N/A
Titanium Oxide 13463-67-7 100 3.9549 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0272 N/A
Water 7732-18-5 100 0.0272 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0582 N/A
CAN-2411 Non-emulsifier Canyon Demulsifier Ethylene glycol 107-21-1 100 0.0432 N/A
Isopropanol 67-63-0 100 0.0432 N/A
Water 7732-18-5 100 0.0432 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0472 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-15 2014-11-15 Surface Water - Runoff 3363
2014-11-13 2014-11-15 Surface Water - Runoff 5076
2014-11-15 2014-11-15 Recycled Fracturing Water (treated at well site) 1950
2014-11-15 2014-11-15 Recycled Fracturing Water (treated at well site) 95

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 231 0.0 0.0 0.0
2015 7995 0.0 0.0 0.0
2016 8656 0.0 0.0 0.0
2017 6142 0.0 0.0 0.0
2018 5950 0.0 0.0 0.0
2019 7743 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-12 No Incident Encountered 0.00 0.00
2014-11-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References