If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786120113020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.722997,"lon":-119.704492,"icon":""}]} |
Location: 02/13-01-078-12W6/0 | |
Location Alias: 02/13-01-78-12 W6M | |
Location Alias 2: 02/13-01-078-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 12 | |
Section: 01 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP 102 HZ PCOUPES 13-1-78-12 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0463553 | |
License Date: 2014-01-09 | |
License Status: Issued | |
Spud Date: 2014-01-15 | |
Final Drill Date: 2014-02-08 | |
Well Total Depth: 4188.00 m | |
Surface Hole Latitude: 55.722997 | |
Surface Hole Longitude: -119.704492 |
Date | Event |
---|---|
2014-01-09 | Obtained License |
2014-01-18 | Surface Casing Operation Performed |
2014-01-21 | Direction Drilling Operation Performed - Deviate |
2014-01-26 | Direction Drilling Operation Performed - Horizontal |
2014-02-06 | Well Log Performed |
2014-02-08 | Finished Drilling |
2014-02-08 | Well Mode changed to Drilled and Cased |
2014-02-10 | Perforation Treatment Performed - Open-Hole Completion |
2014-02-10 | Production Casing Operation Performed |
2014-02-10 | Rig Released |
2014-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-04 | Well Fluid changed to Gas |
2014-04-04 | Well Mode changed to Testing |
2014-05-08 | Well Began Production |
2014-05-08 | Well Fluid changed to Gas |
2014-05-08 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-01-15 | Precision Drilling Corporation | 322 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-21 | 1768.60 | Deviate (5 - 79 degrees) |
2014-01-26 | 2413.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-10 | Open Hole/Barefoot Completion | 4186.30 | 4188.00 | 0 |
2014-03-30 | Multi-Stage Fracture | 3527.80 | 3528.60 | 0 |
2014-03-30 | Multi-Stage Fracture | 3444.90 | 3445.80 | 0 |
2014-03-30 | Multi-Stage Fracture | 3373.20 | 3374.10 | 0 |
2014-03-30 | Multi-Stage Fracture | 3289.30 | 3290.10 | 0 |
2014-03-30 | Multi-Stage Fracture | 3206.50 | 3207.30 | 0 |
2014-03-30 | Multi-Stage Fracture | 3134.70 | 3135.50 | 0 |
2014-03-31 | Multi-Stage Fracture | 3050.80 | 3051.60 | 0 |
2014-03-31 | Multi-Stage Fracture | 2978.20 | 2979.00 | 0 |
2014-03-31 | Multi-Stage Fracture | 2895.10 | 2895.90 | 0 |
2014-04-01 | Multi-Stage Fracture | 2811.60 | 2812.40 | 0 |
2014-03-28 | Multi-Stage Fracture | 4161.30 | 4162.70 | 0 |
2014-04-01 | Multi-Stage Fracture | 2740.00 | 2740.80 | 0 |
2014-04-01 | Multi-Stage Fracture | 2656.70 | 2657.60 | 0 |
2014-04-01 | Multi-Stage Fracture | 2573.50 | 2574.40 | 0 |
2014-04-01 | Multi-Stage Fracture | 2502.00 | 2502.80 | 0 |
2014-03-28 | Multi-Stage Fracture | 4075.50 | 4076.40 | 0 |
2014-03-29 | Multi-Stage Fracture | 4003.00 | 4003.80 | 0 |
2014-03-29 | Multi-Stage Fracture | 3919.40 | 3920.30 | 0 |
2014-03-29 | Multi-Stage Fracture | 3847.30 | 3848.10 | 0 |
2014-03-29 | Multi-Stage Fracture | 3764.70 | 3765.60 | 0 |
2014-03-29 | Multi-Stage Fracture | 3681.80 | 3682.60 | 0 |
2014-03-29 | Multi-Stage Fracture | 3610.20 | 3611.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-03-28 | 2014-04-01 | 2,258 | 1,637 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 40.6324 | N/A | |||
water | Not Available | 100 | 35.9666 | N/A | ||||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 19.6005 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 1.0152 | N/A | ||
SiberProp 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 2.3985 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.004 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.004 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.004 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.004 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.004 | N/A | ||||
EnCap-HP | Trican | Breaker | ammonium persulfate | 7727-54-0 | 100 | 0.0097 | N/A | |
cured acrylic resin | Not Available | 100 | 0.0097 | N/A | ||||
silica crystalline | 14808-60-7 | 100 | 0.0097 | N/A | ||||
CC-3 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.0723 | N/A | |
formic acid | 64-18-6 | 100 | 0.0723 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0723 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0054 | N/A | |
water | Not Available | 100 | 0.0054 | N/A | ||||
WF-2 | Trican | Foamer | 2-butoxyethanol | 111-76-2 | 100 | 0.3571 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.3571 | N/A | ||||
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy | 31726-34-8 | 100 | 0.3571 | N/A | ||||
polyethylene glycol hexyl ether sulfate. ammonium salt | 63428-86-4 | 100 | 0.3571 | N/A | ||||
sulfonate. alkyl (C14-16)olefin. sodium salt | 68439-57-6 | 100 | 0.3571 | N/A | ||||
WG-33L | Trican | Gelling Agent | carboxymethyl hydroxypropyl guar | 68130-15-4 | 100 | 0.2619 | N/A | |
mineral oil | Not Available | 100 | 0.2619 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0041 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0041 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0041 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0041 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0041 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-03-10 | 2014-03-31 | Surface Water - Runoff | 1782 |
2014-03-28 | 2014-03-28 | Recycled Fracturing Water (treated at well site) | 120 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5311 | 0.0 | 0.0 | 0.0 |
2015 | 6794 | 0.0 | 0.0 | 0.0 |
2016 | 8505 | 0.0 | 0.0 | 0.0 |
2017 | 7002 | 0.0 | 0.0 | 0.0 |
2018 | 6539 | 0.0 | 0.0 | 0.0 |
2019 | 8722 | 0.0 | 0.0 | 0.0 |
2020 | 1844 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-10 | No Incident Encountered | 0.00 | 0.00 |
2014-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]