If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0795202108005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.847263,"lon":-117.033559,"icon":""}]} |
Location: 00/08-21-079-20W5/5 | |
Location Alias: 00/08-21-79-20 W5M | |
Location Alias 2: 00/08-21-079-20 W5/05 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 5 | |
Range: 20 | |
Section: 21 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: BAYTEX W455 HZ KIMIWAN 8-21-79-20 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0475203 | |
License Date: 2015-04-10 | |
License Status: Amended | |
Spud Date: 2018-01-23 | |
Final Drill Date: 2018-02-07 | |
Well Total Depth: 2894.00 m | |
Surface Hole Latitude: 55.847263 | |
Surface Hole Longitude: -117.033559 |
Date | Event |
---|---|
2015-04-10 | Obtained License |
2018-01-24 | Surface Casing Operation Performed |
2018-01-25 | Direction Drilling Operation Performed - Deviate |
2018-01-26 | Direction Drilling Operation Performed - Horizontal |
2018-01-26 | Intermediate Casing Operation Performed |
2018-02-03 | Direction Drilling Operation Performed - Horizontal |
2018-02-06 | Direction Drilling Operation Performed - Horizontal |
2018-02-07 | Finished Drilling |
2018-02-07 | Well Log Performed |
2018-02-07 | Well Structure changed to Drain |
2018-02-22 | Perforation Treatment Performed - Open-Hole Completion |
2018-02-22 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-25 | 517.10 | Deviate (5 - 79 degrees) |
2018-01-26 | 913.10 | Horizontal |
2018-02-03 | 1044.00 | Horizontal |
2018-02-06 | 1933.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-22 | Open Hole/Barefoot Completion | 1933.00 | 2894.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]