If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796042015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.865886,"lon":-118.584018,"icon":""}]} |
Location: 00/15-20-079-04W6/0 | |
Location Alias: 00/15-20-79-04 W6M | |
Location Alias 2: 00/15-20-079-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 04 | |
Section: 20 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: CNRL BOUCHER 15-20-79-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0168565 | |
License Date: 1994-07-12 | |
License Status: Abandoned | |
Spud Date: 1994-07-17 | |
Final Drill Date: 1994-07-29 | |
Well Total Depth: 1820.00 m | |
Surface Hole Latitude: 55.865886 | |
Surface Hole Longitude: -118.584018 |
Date | Event |
---|---|
1994-07-12 | Obtained License |
1994-07-17 | Lost Circulation Occurred |
1994-07-18 | Lost Circulation Occurred |
1994-07-18 | Surface Casing Operation Performed |
1994-07-29 | Finished Drilling |
1994-07-29 | Well Log Performed |
1994-07-29 | Well Mode changed to Drilled and Cased |
1994-07-30 | Kick Occurred |
1994-07-31 | Drill Stem Test Performed |
1994-08-01 | Drill Stem Test Performed |
1994-08-02 | Drill Stem Test Performed |
1994-08-06 | Production Casing Operation Performed |
1994-08-06 | Rig Released |
1994-10-03 | Well Log Performed |
1994-10-04 | Well Log Performed |
1994-10-05 | Perforation Treatment Performed - Jet Perforation |
1994-10-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-10 | Well Log Performed |
1994-10-11 | Well Log Performed |
1994-10-12 | Perforation Treatment Performed - Jet Perforation |
1994-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-16 | Well Log Performed |
1995-02-22 | Well Began Production |
1995-02-22 | Well Fluid changed to Gas |
1995-02-22 | Well Mode changed to Flowing |
1996-09-16 | Well Log Performed |
1996-09-17 | Perforation Treatment Performed - Jet Perforation |
1996-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-10-01 | Well Fluid changed to Gas |
1996-10-01 | Well Mode changed to Flowing |
2001-06-02 | Well Log Performed |
2001-07-06 | Well Log Performed |
2001-07-08 | Perforation Treatment Performed - Cement Squeeze |
2001-07-11 | Perforation Treatment Performed - Cement Plug |
2001-07-11 | Perforation Treatment Performed - Cement Squeeze |
2001-07-11 | Well Log Performed |
2001-07-16 | Well Log Performed |
2001-07-19 | Well Log Performed |
2001-08-02 | Perforation Treatment Performed - Cement Plug |
2001-08-02 | Well Log Performed |
2001-08-03 | Perforation Treatment Performed - Jet Perforation |
2001-08-03 | Well Log Performed |
2001-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-08-04 | Plug Back Performed |
2001-08-04 | Well Fluid changed to Gas |
2001-08-04 | Well Log Performed |
2001-08-04 | Well Mode changed to Abandoned Zone |
2001-08-05 | Perforation Treatment Performed - Jet Perforation |
2001-08-05 | Well Log Performed |
2003-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-12-06 | Perforation Treatment Performed - Jet Perforation |
2003-12-06 | Plug Back Performed |
2003-12-06 | Well Log Performed |
2003-12-07 | Perforation Treatment Performed - Jet Perforation |
2006-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-20 | Plug Back Performed |
2006-03-21 | Perforation Treatment Performed - Jet Perforation |
2006-03-21 | Well Log Performed |
2013-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-02-10 | Plug Back Performed |
2013-02-10 | Well Log Performed |
2013-02-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-10-05 | Perforation | 1773.00 | 1778.00 | 14 |
2001-07-11 | Cement Plug | 1401.50 | 1778.00 | 0 |
2001-08-02 | Cement Plug | 1397.00 | 1401.50 | 0 |
2001-08-03 | Perforation | 1372.00 | 1374.00 | 17 |
2001-08-04 | Packing Device Capped w/Cement | 1362.00 | 1370.00 | 0 |
2001-08-05 | Perforation | 1153.50 | 1154.50 | 17 |
2003-12-06 | Packing Device Capped w/Cement | 1142.00 | 1150.00 | 0 |
2003-12-06 | Perforation | 1114.00 | 1116.50 | 17 |
2003-12-07 | Perforation | 981.00 | 982.50 | 17 |
2006-03-20 | Packing Device Capped w/Cement | 1101.60 | 1110.00 | 0 |
2006-03-20 | Packing Device Capped w/Cement | 966.60 | 974.00 | 0 |
1994-10-06 | Acid Treatment | 1773.00 | 1778.00 | 0 |
2006-03-21 | Perforation | 938.00 | 939.00 | 29 |
2006-03-21 | Perforation | 924.50 | 925.50 | 20 |
2013-02-10 | Packing Device Capped w/Cement | 912.00 | 920.00 | 0 |
1994-10-12 | Perforation | 1751.50 | 1758.00 | 18 |
1994-10-12 | Perforation | 1763.00 | 1765.00 | 18 |
1994-10-13 | Acid Treatment | 1751.50 | 1758.00 | 0 |
1996-09-17 | Perforation | 1372.00 | 1375.00 | 14 |
1996-09-21 | Acid Treatment | 1372.00 | 1375.00 | 0 |
2001-07-08 | Cement Squeeze | 1372.00 | 1375.00 | 0 |
2001-07-11 | Cement Squeeze | 1751.50 | 1778.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 6966 | 0.0 | 0.0 | 0.0 |
1996 | 7723 | 0.0 | 0.0 | 0.0 |
1997 | 8247 | 0.0 | 0.0 | 0.0 |
1998 | 8500 | 0.0 | 0.0 | 0.0 |
1999 | 6657 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-07-17 | Lost Circulation | 139.00 | 141.00 |
1994-07-18 | Lost Circulation | 310.00 | 328.00 |
1994-07-30 | Kick | 1820.00 | 1820.00 |
2013-02-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]