If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796050909003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.834816,"lon":-118.711091,"icon":""}]} |
Location: 00/09-09-079-05W6/3 | |
Location Alias: 00/09-09-79-05 W6M | |
Location Alias 2: 00/09-09-079-05 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 05 | |
Section: 09 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: CNRL ET AL HOWARD 9-9-79-5 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0107393 | |
License Date: 1984-05-31 | |
License Status: Suspension | |
Spud Date: 1984-06-17 | |
Final Drill Date: 1984-07-08 | |
Well Total Depth: 1705.00 m | |
Surface Hole Latitude: 55.834816 | |
Surface Hole Longitude: -118.711091 |
Date | Event |
---|---|
1984-05-31 | Obtained License |
1984-06-18 | Surface Casing Operation Performed |
1984-06-23 | Kick Occurred |
1984-06-25 | Well Log Performed |
1984-06-28 | Drill Stem Test Performed |
1984-06-30 | Drill Stem Test Performed |
1984-07-08 | Finished Drilling |
1984-07-08 | Well Mode changed to Drilled and Cased |
1984-07-09 | Well Log Performed |
1984-07-11 | Production Casing Operation Performed |
1984-07-11 | Rig Released |
1989-07-22 | Well Log Performed |
1989-07-23 | Perforation Treatment Performed - Jet Perforation |
1989-07-23 | Well Log Performed |
1989-07-28 | Perforation Treatment Performed - Jet Perforation |
1989-07-28 | Well Log Performed |
1989-07-29 | Perforation Treatment Performed - Jet Perforation |
1989-07-29 | Well Log Performed |
1997-06-07 | Perforation Treatment Performed - Jet Perforation |
1999-01-04 | Well Began Production |
1999-01-04 | Well Fluid changed to Gas |
1999-01-04 | Well Mode changed to Flowing |
1999-11-30 | Well Fluid changed to Gas |
1999-11-30 | Well Mode changed to Suspended |
2000-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-10 | Perforation Treatment Performed - Cement Squeeze |
2000-01-10 | Plug Back Performed |
2000-01-10 | Well Fluid changed to Gas |
2000-01-10 | Well Mode changed to Abandoned Zone |
2000-01-11 | Well Log Performed |
2000-01-12 | Perforation Treatment Performed - Jet Perforation |
2000-01-13 | Perforation Treatment Performed - Jet Perforation |
2004-08-20 | Well Log Performed |
2004-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-22 | Plug Back Performed |
2011-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-20 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-07-23 | Perforation | 1585.50 | 1586.50 | 13 |
2000-01-13 | Perforation | 1089.00 | 1090.00 | 14 |
2000-01-13 | Perforation | 1092.00 | 1093.00 | 14 |
2000-01-13 | Perforation | 1094.00 | 1095.00 | 14 |
2000-01-13 | Perforation | 1099.00 | 1099.50 | 14 |
2004-08-22 | Packing Device Capped w/Cement | 1077.00 | 1085.00 | 0 |
2011-10-20 | Packing Device Capped w/Cement | 967.00 | 975.00 | 0 |
1989-07-28 | Perforation | 1198.00 | 1199.50 | 13 |
1989-07-29 | Perforation | 1198.00 | 1199.50 | 13 |
1997-06-07 | Perforation | 1183.00 | 1185.00 | 18 |
2000-01-10 | Packing Device Capped w/Cement | 1153.50 | 1562.00 | 0 |
2000-01-10 | Cement Squeeze | 1183.00 | 1199.50 | 0 |
2000-01-12 | Perforation | 980.50 | 980.50 | 2 |
2000-01-12 | Perforation | 980.00 | 981.00 | 14 |
2000-01-13 | Perforation | 994.00 | 996.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 5942 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-06-23 | Kick | 1188.00 | 1188.00 |
For data sources see[6]