X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796071001000

Well Details

Well ID: 0796071001000
Loading map...
Location: 00/01-10-079-07W6/0
Location Alias: 00/01-10-79-07 W6M
Location Alias 2: 00/01-10-079-07 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 10
County/Municipality: Saddle Hills County
Well Name: R S R HZ MIRAGE 1-10-79-7
Operator Name: Rising Star Resources Ltd.
License Number: 0492069
License Date: 2018-11-15
License Status: Issued
Spud Date: 2018-11-21
Final Drill Date: 2018-11-30
Well Total Depth: 2906.00 m
Surface Hole Latitude: 55.825982
Surface Hole Longitude: -119.022416

For data sources see[1][2]

Well History

Date Event
2018-11-15 Obtained License
2018-11-22 Surface Casing Operation Performed
2018-11-25 Direction Drilling Operation Performed - Deviate
2018-11-25 Well Log Performed
2018-11-26 Direction Drilling Operation Performed - Horizontal
2018-11-26 Intermediate Casing Operation Performed
2018-11-30 Finished Drilling
2018-11-30 Well Log Performed
2018-11-30 Well Mode changed to Drilled and Cased
2018-12-01 Liner Casing Operation Performed
2018-12-02 Rig Released
2019-01-01 Well Fluid changed to Crude Oil
2019-01-01 Well Mode changed to Drilling and Completing
2019-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-21 Well Began Production
2019-01-21 Well Fluid changed to Crude Oil
2019-01-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-21 Savana Oilsands Management Ltd. 437 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-25 1040.60 Deviate (5 - 79 degrees)
2018-11-26 1455.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-07 Multi-Stage Fracture 2885.90 2886.00 0
2019-01-08 Multi-Stage Fracture 2533.00 2533.10 0
2019-01-08 Multi-Stage Fracture 2485.60 2485.70 0
2019-01-08 Multi-Stage Fracture 2432.80 2432.90 0
2019-01-08 Multi-Stage Fracture 2385.40 2385.50 0
2019-01-08 Multi-Stage Fracture 2336.30 2336.40 0
2019-01-08 Multi-Stage Fracture 2286.50 2286.60 0
2019-01-08 Multi-Stage Fracture 2239.10 2239.20 0
2019-01-08 Multi-Stage Fracture 2191.70 2191.80 0
2019-01-08 Multi-Stage Fracture 2131.60 2131.70 0
2019-01-08 Multi-Stage Fracture 2095.80 2095.90 0
2019-01-07 Multi-Stage Fracture 2844.80 2844.90 0
2019-01-08 Multi-Stage Fracture 2050.00 2050.10 0
2019-01-08 Multi-Stage Fracture 2003.40 2003.50 0
2019-01-08 Multi-Stage Fracture 1956.40 1956.50 0
2019-01-08 Multi-Stage Fracture 1909.00 1909.10 0
2019-01-08 Multi-Stage Fracture 1846.80 1846.90 0
2019-01-08 Multi-Stage Fracture 1804.60 1804.70 0
2019-01-08 Multi-Stage Fracture 1762.20 1762.30 0
2019-01-08 Multi-Stage Fracture 1681.40 1681.50 0
2019-01-08 Multi-Stage Fracture 1645.20 1645.30 0
2019-01-08 Multi-Stage Fracture 1591.50 1591.60 0
2019-01-07 Multi-Stage Fracture 2808.40 2808.50 0
2019-01-08 Multi-Stage Fracture 1536.90 1537.00 0
2019-01-08 Multi-Stage Fracture 2772.50 2772.60 0
2019-01-08 Multi-Stage Fracture 2734.40 2734.50 0
2019-01-08 Multi-Stage Fracture 2698.90 2699.00 0
2019-01-08 Multi-Stage Fracture 2663.10 2663.20 0
2019-01-08 Multi-Stage Fracture 2623.80 2623.90 0
2019-01-08 Multi-Stage Fracture 2587.90 2588.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-07 2019-01-08 1,325 2,992 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 1.5704 N/A
water Not Available 100 88.6596 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 9.5852 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0188 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0438 N/A
HVFR-2 Trican Friction Reducer alcohols C12-C15. ethoxylated propoxylated 68551-13-3 100 0.166 N/A
distillates (petroleum). hydrotreated heavy naphthenic 64742-52-5 100 0.166 N/A
naphtha (petroleum). hydrotreated heavy 64742-48-9 100 0.166 N/A
non-hazardous ingredients Not Available 100 0.166 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0207 N/A
PFC-3 Trican Surfactant aminofunctional polymer 10352 100 0.0407 N/A
glycol ether 10352 100 0.0407 N/A
petroleum distillates 10352 100 0.0407 N/A
silicon compound 10352 100 0.0408 N/A
S-28 Trican Surfactant methanol 67-56-1 100 0.0421 N/A
non-hazardous ingredients Not Available 100 0.0421 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0421 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-03 2019-01-08 Municipal Water 1720
2019-01-03 2019-01-06 Waste Water - Municipal 1659
2019-01-06 2019-01-06 Municipal Water 30

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 8001 0.0 0.0 0.0
2020 1681 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-02 No Incident Encountered 0.00 0.00
2019-01-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References