X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796071016000

Well Details

Well ID: 0796071016000
Loading map...
Location: 00/16-10-079-07W6/0
Location Alias: 00/16-10-79-07 W6M
Location Alias 2: 00/16-10-079-07 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 10
County/Municipality: Saddle Hills County
Well Name: R S R HZ MIRAGE 16-10-79-7
Operator Name: Rising Star Resources Ltd.
License Number: 0489518
License Date: 2018-06-11
License Status: Issued
Spud Date: 2018-06-21
Final Drill Date: 2018-07-01
Well Total Depth: 3300.00 m
Surface Hole Latitude: 55.832058
Surface Hole Longitude: -119.025904

For data sources see[1][2]

Well History

Date Event
2018-06-11 Obtained License
2018-06-22 Surface Casing Operation Performed
2018-06-24 Direction Drilling Operation Performed - Deviate
2018-06-25 Direction Drilling Operation Performed - Horizontal
2018-06-25 Intermediate Casing Operation Performed
2018-06-25 Well Log Performed
2018-07-01 Finished Drilling
2018-07-01 Liner Casing Operation Performed
2018-07-01 Well Log Performed
2018-07-01 Well Mode changed to Drilled and Cased
2018-07-02 Rig Released
2018-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-01 Well Fluid changed to Crude Oil
2018-08-01 Well Mode changed to Drilling and Completing
2018-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-12 Well Began Production
2018-08-12 Well Fluid changed to Crude Oil
2018-08-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-06-21 Precision Drilling Corporation 185 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-06-24 981.60 Deviate (5 - 79 degrees)
2018-06-25 1477.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-28 Multi-Stage Fracture 3261.00 3261.10 0
2018-08-02 Multi-Stage Fracture 2224.60 2224.70 0
2018-08-02 Multi-Stage Fracture 2163.50 2163.60 0
2018-08-02 Multi-Stage Fracture 2102.00 2102.10 0
2018-08-02 Multi-Stage Fracture 2028.30 2028.40 0
2018-08-02 Multi-Stage Fracture 1966.60 1966.70 0
2018-08-02 Multi-Stage Fracture 1904.70 1904.80 0
2018-08-02 Multi-Stage Fracture 1855.10 1855.20 0
2018-08-02 Multi-Stage Fracture 1805.40 1805.50 0
2018-08-02 Multi-Stage Fracture 1753.80 1753.90 0
2018-08-02 Multi-Stage Fracture 1698.90 1699.00 0
2018-07-29 Multi-Stage Fracture 3147.30 3147.40 0
2018-08-02 Multi-Stage Fracture 1643.60 1643.70 0
2018-08-02 Multi-Stage Fracture 1596.20 1596.30 0
2018-08-02 Multi-Stage Fracture 1558.20 1558.30 0
2018-08-01 Multi-Stage Fracture 3085.70 3085.80 0
2018-08-02 Multi-Stage Fracture 2594.50 2594.60 0
2018-08-02 Multi-Stage Fracture 2520.70 2520.80 0
2018-08-02 Multi-Stage Fracture 2471.00 2471.10 0
2018-08-02 Multi-Stage Fracture 2409.60 2409.70 0
2018-08-02 Multi-Stage Fracture 2336.10 2336.20 0
2018-08-02 Multi-Stage Fracture 2274.40 2274.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-28 2018-08-02 1,325 2,129 N/A
2 2018-08-02 2018-08-02 1,325 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 4.1305 N/A
Water 7732-18-5 100 86.722 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 5.7459 N/A
20/40 Yukon Black Step Energy Services Quartz (SiO2) 14808-60-7 100 3.8981 N/A
2K7 W-M (Biocide) Step Energy Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3.-diol (BNPD) 52-51-7 100 0.01 N/A
Methanol 67-56-1 100 0.01 N/A
Non-Hazardous Ingredients Not Available 100 0.01 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0143 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.134 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.2476 N/A
Non-Hazardous Ingredients Not Available 100 0.2476 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2476 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0097 N/A
Non-Hazardous Ingredients Not Available 100 0.0097 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.2654 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.2654 N/A
Methanol 67-56-1 100 0.2654 N/A
Monoethanolamine 141-43-5 100 0.2654 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.2654 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.2654 N/A
Water 7732-18-5 100 0.2654 N/A
2 50/140 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 1.1296 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-20 2018-08-01 Surface Water - Runoff 2867

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2843 0.0 0.0 0.0
2019 7547 0.0 0.0 0.0
2020 2155 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-02 No Incident Encountered 0.00 0.00
2018-08-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References