X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796071914002

Well Details

Well ID: 0796071914002
Loading map...
Location: 00/14-19-079-07W6/2
Location Alias: 00/14-19-79-07 W6M
Location Alias 2: 00/14-19-079-07 W6/02
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 19
County/Municipality: Saddle Hills County
Well Name: R S R MIRAGE 14-19-79-7
Operator Name: Rising Star Resources Ltd.
License Number: 0134553
License Date: 1988-06-24
License Status: Abandoned
Spud Date: 1988-07-21
Final Drill Date: 1988-07-29
Well Total Depth: 1425.00 m
Surface Hole Latitude: 55.865863
Surface Hole Longitude: -119.087579

For data sources see[1][2]

Well History

Date Event
1988-03-15 Well Log Performed
1988-06-24 Obtained License
1988-07-21 Surface Casing Operation Performed
1988-07-23 Lost Circulation Occurred
1988-07-26 Drill Stem Test Performed
1988-07-29 Finished Drilling
1988-07-29 Well Log Performed
1988-07-29 Well Mode changed to Drilled and Cased
1988-07-30 Production Casing Operation Performed
1988-07-30 Rig Released
1988-08-22 Well Log Performed
1988-08-23 Perforation Treatment Performed - Jet Perforation
1988-08-23 Well Log Performed
1995-03-19 Well Log Performed
2002-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-26 Plug Back Performed
2002-11-26 Well Log Performed
2002-11-27 Perforation Treatment Performed - Jet Perforation
2002-11-27 Well Log Performed
2003-01-06 Well Began Production
2003-01-06 Well Fluid changed to Gas
2003-01-06 Well Mode changed to Flowing
2010-02-01 Well Fluid changed to Gas
2010-02-01 Well Mode changed to Suspended
2018-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-10 Plug Back Performed
2018-07-12 Perforation Treatment Performed - Jet Perforation
2018-07-13 Perforation Treatment Performed - Cement Plug
2018-07-13 Perforation Treatment Performed - Cement Squeeze
2018-07-13 Plug Back Performed
2018-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-14 Perforation Treatment Performed - Jet Perforation
2018-07-14 Plug Back Performed
2018-07-14 Well Fluid changed to Gas
2018-07-14 Well Mode changed to Abandoned Zone
2018-11-28 Well Abandoned
2018-11-28 Well Fluid changed to Gas
2018-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-08-23 Perforation 1395.00 1399.00 13
2002-11-26 Packing Device Capped w/Cement 1365.00 1373.00 0
2002-11-27 Perforation 1221.00 1223.00 17
2018-07-10 Packing Device Capped w/Cement 1204.00 1212.00 0
2018-07-12 Perforation 449.00 450.00 17
2018-07-13 Cement Squeeze 449.00 450.00 0
2018-07-13 Cement Plug 277.90 445.00 0
2018-07-14 Perforation 264.00 265.00 17
2018-07-14 Packing Device Capped w/Cement 230.00 260.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4103 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-07-23 Lost Circulation 847.00 982.00
2018-07-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References