X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796082804000

Well Details

Well ID: 0796082804000
Loading map...
Location: 00/04-28-079-08W6/0
Location Alias: 00/04-28-79-08 W6M
Location Alias 2: 00/04-28-079-08 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 08
Section: 28
County/Municipality: Saddle Hills County
Well Name: R S R HZ MIRAGE 4-28-79-8
Operator Name: Rising Star Resources Ltd.
License Number: 0489720
License Date: 2018-06-25
License Status: Issued
Spud Date: 2018-07-27
Final Drill Date: 2018-08-06
Well Total Depth: 3100.00 m
Surface Hole Latitude: 55.871162
Surface Hole Longitude: -119.169329

For data sources see[1][2]

Well History

Date Event
2018-06-25 Obtained License
2018-07-28 Surface Casing Operation Performed
2018-07-30 Direction Drilling Operation Performed - Deviate
2018-07-30 Direction Drilling Operation Performed - Horizontal
2018-07-30 Well Log Performed
2018-08-01 Intermediate Casing Operation Performed
2018-08-03 Well Log Performed
2018-08-06 Finished Drilling
2018-08-06 Well Log Performed
2018-08-06 Well Mode changed to Drilled and Cased
2018-08-07 Liner Casing Operation Performed
2018-08-07 Well Fluid changed to Crude Oil
2018-08-07 Well Log Performed
2018-08-07 Well Mode changed to Drilling and Completing
2018-08-08 Rig Released
2018-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Well Began Production
2018-09-01 Well Fluid changed to Crude Oil
2018-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-27 Precision Drilling Corporation 185 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-30 1132.40 Deviate (5 - 79 degrees)
2018-07-30 1586.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-14 Multi-Stage Fracture 3078.40 3079.10 0
2018-08-14 Multi-Stage Fracture 2646.60 2647.20 0
2018-08-14 Multi-Stage Fracture 2599.20 2599.80 0
2018-08-14 Multi-Stage Fracture 2551.80 2552.40 0
2018-08-14 Multi-Stage Fracture 2481.40 2482.00 0
2018-08-14 Multi-Stage Fracture 2434.00 2434.60 0
2018-08-14 Multi-Stage Fracture 2375.30 2375.90 0
2018-08-14 Multi-Stage Fracture 2316.40 2317.70 0
2018-08-14 Multi-Stage Fracture 2269.10 2270.30 0
2018-08-14 Multi-Stage Fracture 2222.00 2223.20 0
2018-08-14 Multi-Stage Fracture 2174.80 2176.00 0
2018-08-14 Multi-Stage Fracture 3026.70 3027.40 0
2018-08-14 Multi-Stage Fracture 2127.50 2128.70 0
2018-08-14 Multi-Stage Fracture 2080.50 2081.70 0
2018-08-14 Multi-Stage Fracture 2033.50 2034.80 0
2018-08-14 Multi-Stage Fracture 1986.60 1987.80 0
2018-08-14 Multi-Stage Fracture 1927.70 1928.90 0
2018-08-14 Multi-Stage Fracture 1857.40 1858.60 0
2018-08-14 Multi-Stage Fracture 1810.40 1811.60 0
2018-08-14 Multi-Stage Fracture 1763.10 1764.40 0
2018-08-14 Multi-Stage Fracture 1716.10 1717.30 0
2018-08-14 Multi-Stage Fracture 1668.70 1669.90 0
2018-08-14 Multi-Stage Fracture 2979.10 2979.70 0
2018-08-14 Multi-Stage Fracture 2931.40 2932.00 0
2018-08-14 Multi-Stage Fracture 2883.90 2884.50 0
2018-08-14 Multi-Stage Fracture 2836.20 2836.80 0
2018-08-14 Multi-Stage Fracture 2789.20 2789.90 0
2018-08-14 Multi-Stage Fracture 2741.70 2742.30 0
2018-08-14 Multi-Stage Fracture 2694.20 2694.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-14 2018-08-14 1,439 3,627 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.0787 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.5334 N/A
silica crystalline 14808-60-7 100 4.5334 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 6.8313 N/A
AcResin Activator W Trican Activator alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0904 N/A
methanol 67-56-1 100 0.0904 N/A
polyethylene glycol 25322-68-3 100 0.0904 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.0109 N/A
polyethylene glycol 25322-68-3 100 0.0109 N/A
sodium bromide 7647-15-6 100 0.0109 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0281 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1601 N/A
non-hazardous ingredients Not Available 100 0.1601 N/A
HVFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.2023 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0206 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0436 N/A
non-hazardous ingredients Not Available 100 0.0436 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-10 2018-08-14 Surface Water - Runoff 3684

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2291 0.0 0.0 0.0
2019 6890 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-08 No Incident Encountered 0.00 0.00
2018-08-19 No Incident Encountered 0.00 0.00
2018-08-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References