If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0805231906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.948444,"lon":-117.591593,"icon":""}]} |
Location: 00/06-19-080-23W5/0 | |
Location Alias: 00/06-19-80-23 W5M | |
Location Alias 2: 00/06-19-080-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 5 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Birch Hills County | |
Well Name: PROCYON TANGENT 6-19-80-23 | |
Operator Name: Procyon Energy Corp. | |
License Number: 0113954 | |
License Date: 1985-03-13 | |
License Status: Suspension | |
Spud Date: 1985-05-15 | |
Final Drill Date: 1985-06-29 | |
Well Total Depth: 1850.00 m | |
Surface Hole Latitude: 55.948444 | |
Surface Hole Longitude: -117.591593 |
Date | Event |
---|---|
1985-03-13 | Obtained License |
1985-06-16 | Surface Casing Operation Performed |
1985-06-29 | Finished Drilling |
1985-06-29 | Well Mode changed to Drilled and Cased |
1985-07-03 | Plug Back Performed |
1985-07-03 | Well Log Performed |
1985-07-06 | Production Casing Operation Performed |
1985-07-06 | Rig Released |
1985-07-16 | Well Log Performed |
1985-07-17 | Perforation Treatment Performed - Jet Perforation |
1985-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-07-23 | Well Began Production |
1985-07-23 | Well Fluid changed to Crude Oil |
1985-07-23 | Well Mode changed to Flowing |
1987-02-03 | Perforation Treatment Performed - Jet Perforation |
1987-02-08 | Perforation Treatment Performed - Jet Perforation |
1987-02-12 | Perforation Treatment Performed - Cement Squeeze |
1987-02-14 | Well Log Performed |
1987-02-15 | Perforation Treatment Performed - Jet Perforation |
1987-05-14 | Well Fluid changed to Crude Oil |
1987-05-14 | Well Mode changed to Pumping |
1991-09-16 | Well Fluid changed to Crude Oil |
1991-09-16 | Well Mode changed to Suspended |
1991-09-27 | Well Log Performed |
2000-07-23 | Well Log Performed |
2002-09-19 | Perforation Treatment Performed - Jet Perforation |
2002-09-23 | Perforation Treatment Performed - Jet Perforation |
2002-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-26 | Perforation Treatment Performed - Jet Perforation |
2005-07-26 | Plug Back Performed |
2005-07-26 | Well Fluid changed to Crude Oil |
2005-07-26 | Well Mode changed to Abandoned Zone |
2005-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-27 | Perforation Treatment Performed - Jet Perforation |
2005-07-27 | Plug Back Performed |
2006-12-01 | Well Log Performed |
2006-12-02 | Perforation Treatment Performed - Jet Perforation |
2006-12-02 | Well Log Performed |
2006-12-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-12-03 | Plug Back Performed |
2006-12-05 | Perforation Treatment Performed - Jet Perforation |
2006-12-05 | Well Log Performed |
2007-08-15 | Perforation Treatment Performed - Jet Perforation |
2007-08-16 | Well Log Performed |
2007-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-07-17 | Perforation | 1772.00 | 1775.00 | 13 |
2005-07-26 | Packing Device Capped w/Cement | 1751.00 | 1759.00 | 0 |
2005-07-26 | Perforation | 1578.70 | 1579.20 | 17 |
2005-07-27 | Packing Device Capped w/Cement | 1565.00 | 1573.00 | 0 |
2005-07-27 | Perforation | 1081.80 | 1082.60 | 17 |
2005-07-27 | Perforation | 1083.80 | 1085.90 | 17 |
2005-07-27 | Perforation | 1086.30 | 1087.80 | 17 |
2006-12-02 | Perforation | 1069.00 | 1072.00 | 17 |
2006-12-03 | Packing Device Capped w/Cement | 1054.00 | 1062.00 | 0 |
2006-12-05 | Perforation | 893.00 | 895.00 | 17 |
2007-08-15 | Perforation | 880.50 | 882.50 | 17 |
1985-07-18 | Acid Treatment | 1772.00 | 1775.00 | 0 |
2007-08-21 | Acid Treatment | 880.50 | 882.50 | 0 |
1987-02-03 | Perforation | 1805.50 | 1807.50 | 13 |
1987-02-08 | Perforation | 1788.00 | 1790.00 | 7 |
1987-02-12 | Cement Squeeze | 1772.00 | 1807.50 | 0 |
1987-02-15 | Perforation | 1765.00 | 1766.00 | 7 |
2002-09-19 | Perforation | 1765.00 | 1766.00 | 18 |
2002-09-23 | Perforation | 1768.00 | 1775.00 | 18 |
2002-09-25 | Acid Treatment | 1768.00 | 1775.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 3419 | 0.0 | 0.0 | 0.0 |
1986 | 7691 | 0.0 | 0.0 | 0.0 |
1987 | 7552 | 0.0 | 0.0 | 0.0 |
1988 | 8583 | 0.0 | 0.0 | 0.0 |
1989 | 8710 | 0.0 | 0.0 | 0.0 |
1990 | 8682 | 0.0 | 0.0 | 0.0 |
1991 | 6093 | 0.0 | 0.0 | 0.0 |
For data sources see[5]