X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805231906005

Well Details

Well ID: 0805231906005
Loading map...
Location: 00/06-19-080-23W5/5
Location Alias: 00/06-19-80-23 W5M
Location Alias 2: 00/06-19-080-23 W5/05
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 23
Section: 19
County/Municipality: Birch Hills County
Well Name: PROCYON TANGENT 6-19-80-23
Operator Name: Procyon Energy Corp.
License Number: 0113954
License Date: 1985-03-13
License Status: Suspension
Spud Date: 1985-05-15
Final Drill Date: 1985-06-29
Well Total Depth: 1850.00 m
Surface Hole Latitude: 55.948444
Surface Hole Longitude: -117.591593

For data sources see[1][2]

Well History

Date Event
1985-03-13 Obtained License
1985-06-16 Surface Casing Operation Performed
1985-06-29 Finished Drilling
1985-06-29 Well Mode changed to Drilled and Cased
1985-07-03 Plug Back Performed
1985-07-03 Well Log Performed
1985-07-06 Production Casing Operation Performed
1985-07-06 Rig Released
1985-07-16 Well Log Performed
1985-07-17 Perforation Treatment Performed - Jet Perforation
1985-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-03 Perforation Treatment Performed - Jet Perforation
1987-02-08 Perforation Treatment Performed - Jet Perforation
1987-02-12 Perforation Treatment Performed - Cement Squeeze
1987-02-14 Well Log Performed
1987-02-15 Perforation Treatment Performed - Jet Perforation
1991-09-27 Well Log Performed
2000-07-23 Well Log Performed
2002-09-19 Perforation Treatment Performed - Jet Perforation
2002-09-23 Perforation Treatment Performed - Jet Perforation
2002-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-26 Perforation Treatment Performed - Jet Perforation
2005-07-26 Plug Back Performed
2005-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-27 Perforation Treatment Performed - Jet Perforation
2005-07-27 Plug Back Performed
2006-12-01 Well Log Performed
2006-12-02 Perforation Treatment Performed - Jet Perforation
2006-12-02 Well Log Performed
2006-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-03 Plug Back Performed
2006-12-05 Perforation Treatment Performed - Jet Perforation
2006-12-05 Well Log Performed
2007-08-15 Perforation Treatment Performed - Jet Perforation
2007-08-16 Well Log Performed
2007-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-17 Perforation 1772.00 1775.00 13
2005-07-26 Packing Device Capped w/Cement 1751.00 1759.00 0
2005-07-26 Perforation 1578.70 1579.20 17
2005-07-27 Packing Device Capped w/Cement 1565.00 1573.00 0
2005-07-27 Perforation 1081.80 1082.60 17
2005-07-27 Perforation 1083.80 1085.90 17
2005-07-27 Perforation 1086.30 1087.80 17
2006-12-02 Perforation 1069.00 1072.00 17
2006-12-03 Packing Device Capped w/Cement 1054.00 1062.00 0
2006-12-05 Perforation 893.00 895.00 17
2007-08-15 Perforation 880.50 882.50 17
1985-07-18 Acid Treatment 1772.00 1775.00 0
2007-08-21 Acid Treatment 880.50 882.50 0
1987-02-03 Perforation 1805.50 1807.50 13
1987-02-08 Perforation 1788.00 1790.00 7
1987-02-12 Cement Squeeze 1772.00 1807.50 0
1987-02-15 Perforation 1765.00 1766.00 7
2002-09-19 Perforation 1765.00 1766.00 18
2002-09-23 Perforation 1768.00 1775.00 18
2002-09-25 Acid Treatment 1768.00 1775.00 0

For data sources see[4]



References