If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0805231914003 | Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. |
Location: 00/14-19-080-23W5/3 | |
Location Alias: 00/14-19-80-23 W5M | |
Location Alias 2: 00/14-19-080-23 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 5 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Birch Hills County | |
Well Name: INTERACTION TANGENT 14-19-80-23 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0116023 | |
License Date: 1985-07-11 | |
License Status: Suspension | |
Spud Date: 1985-07-13 | |
Final Drill Date: 1985-07-26 | |
Well Total Depth: 1852.00 m | |
Surface Hole Latitude: 55.952790 | |
Surface Hole Longitude: -117.595804 |
Date | Event |
---|---|
1985-07-11 | Obtained License |
1985-07-15 | Surface Casing Operation Performed |
1985-07-26 | Finished Drilling |
1985-07-26 | Well Log Performed |
1985-07-26 | Well Mode changed to Drilled and Cased |
1985-07-28 | Drill Stem Test Performed |
1985-07-29 | Drill Stem Test Performed |
1985-07-31 | Production Casing Operation Performed |
1985-07-31 | Rig Released |
1985-08-15 | Well Log Performed |
1985-08-17 | Perforation Treatment Performed - Fractured |
1985-08-17 | Perforation Treatment Performed - Jet Perforation |
1985-08-17 | Plug Back Performed |
1985-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-20 | Perforation Treatment Performed - Jet Perforation |
1985-08-21 | Perforation Treatment Performed - Fractured |
1986-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-12-15 | Plug Back Performed |
1999-09-05 | Perforation Treatment Performed - Cement Squeeze |
1999-09-05 | Perforation Treatment Performed - Jet Perforation |
1999-09-06 | Perforation Treatment Performed - Cement Squeeze |
1999-09-06 | Perforation Treatment Performed - Jet Perforation |
1999-09-11 | Perforation Treatment Performed - Cement Squeeze |
1999-09-11 | Perforation Treatment Performed - Jet Perforation |
1999-09-18 | Perforation Treatment Performed - Cement Squeeze |
1999-09-18 | Perforation Treatment Performed - Jet Perforation |
1999-10-06 | Perforation Treatment Performed - Jet Perforation |
1999-10-06 | Well Mode changed to Drilled and Cased |
2011-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-07 | Plug Back Performed |
2011-02-07 | Well Log Performed |
2011-02-07 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-08-17 | Perforation | 1797.40 | 1800.70 | 13 |
1999-09-05 | Perforation | 641.00 | 642.00 | 20 |
1999-09-05 | Cement Squeeze | 641.00 | 642.00 | 0 |
1999-09-06 | Perforation | 620.00 | 621.00 | 20 |
1999-09-06 | Cement Squeeze | 620.00 | 621.00 | 0 |
1999-09-06 | Perforation | 600.00 | 601.00 | 20 |
1999-09-06 | Cement Squeeze | 600.00 | 601.00 | 0 |
1999-09-11 | Cement Squeeze | 620.00 | 621.00 | 0 |
1999-09-11 | Perforation | 461.00 | 462.00 | 17 |
1999-09-11 | Cement Squeeze | 461.00 | 462.00 | 0 |
1999-09-11 | Perforation | 436.00 | 437.00 | 17 |
1985-08-17 | Fracture | 1797.40 | 1800.70 | 0 |
1999-09-11 | Cement Squeeze | 436.00 | 437.00 | 0 |
1999-09-18 | Cement Squeeze | 461.00 | 462.00 | 0 |
1999-09-18 | Perforation | 608.50 | 612.00 | 17 |
1999-09-18 | Perforation | 626.50 | 631.50 | 17 |
1999-10-06 | Perforation | 446.50 | 448.00 | 17 |
2011-02-07 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
2011-02-07 | Packing Device Capped w/Cement | 423.00 | 431.00 | 0 |
1985-08-20 | Packing Device Capped w/Cement | 1787.00 | 1795.00 | 0 |
1985-08-20 | Perforation | 1764.40 | 1772.40 | 13 |
1985-08-20 | Perforation | 1777.20 | 1779.30 | 13 |
1985-08-20 | Perforation | 1782.70 | 1786.90 | 13 |
1985-08-21 | Fracture | 1764.40 | 1786.90 | 0 |
1986-12-15 | Packing Device Capped w/Cement | 1746.00 | 1754.00 | 0 |
1986-12-15 | Packing Device Capped w/Cement | 959.50 | 967.50 | 0 |
For data sources see[4]