If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0805242516024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.967394,"lon":-117.608589,"icon":""}]} |
Location: 02/16-25-080-24W5/4 | |
Location Alias: 02/16-25-80-24 W5M | |
Location Alias 2: 02/16-25-080-24 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 5 | |
Range: 24 | |
Section: 25 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL TANGENT 16-25-80-24 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0092834 | |
License Date: 1981-10-20 | |
License Status: Suspension | |
Spud Date: 1981-10-27 | |
Final Drill Date: 1981-12-03 | |
Well Total Depth: 2246.00 m | |
Surface Hole Latitude: 55.967394 | |
Surface Hole Longitude: -117.608589 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-10-20 | Obtained License |
1981-11-06 | Drill Stem Test Performed |
1981-11-07 | Liner Casing Operation Performed |
1981-12-01 | Drill Stem Test Performed |
1981-12-03 | Finished Drilling |
1981-12-03 | Well Mode changed to Drilled and Cased |
1981-12-06 | Drill Stem Test Performed |
1981-12-07 | Drill Stem Test Performed |
1982-02-12 | Perforation Treatment Performed - Open-Hole Completion |
1982-02-13 | Perforation Treatment Performed - Jet Perforation |
1982-02-15 | Perforation Treatment Performed - Fractured |
1982-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-03-22 | Perforation Treatment Performed - Jet Perforation |
1983-03-23 | Perforation Treatment Performed - Jet Perforation |
1983-03-24 | Perforation Treatment Performed - Cement Squeeze |
1983-03-24 | Perforation Treatment Performed - Open-Hole Completion |
1983-05-20 | Perforation Treatment Performed - Jet Perforation |
1983-05-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-05-27 | Perforation Treatment Performed - Jet Perforation |
1983-05-28 | Perforation Treatment Performed - Fractured |
1983-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-11-14 | Well Log Performed |
1984-11-16 | Perforation Treatment Performed - Jet Perforation |
1984-11-16 | Well Log Performed |
1984-11-17 | Perforation Treatment Performed - Fractured |
1984-11-19 | Well Log Performed |
1984-11-21 | Perforation Treatment Performed - Cement Squeeze |
1984-11-21 | Perforation Treatment Performed - Jet Perforation |
1984-11-21 | Well Log Performed |
1984-11-23 | Perforation Treatment Performed - Jet Perforation |
1984-11-23 | Well Log Performed |
1984-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-11-27 | Perforation Treatment Performed - Fractured |
1984-11-27 | Perforation Treatment Performed - Jet Perforation |
1993-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-02-21 | Perforation Treatment Performed - Cement Squeeze |
1993-02-21 | Perforation Treatment Performed - Jet Perforation |
1993-02-25 | Perforation Treatment Performed - Jet Perforation |
1993-11-09 | Well Began Production |
1993-11-09 | Well Fluid changed to Gas |
1993-11-09 | Well Mode changed to Flowing |
2002-10-31 | Well Fluid changed to Gas |
2002-10-31 | Well Mode changed to Suspended |
2018-01-01 | Well Fluid changed to Gas |
2018-01-01 | Well Mode changed to Flowing |
2018-09-30 | Well Fluid changed to Gas |
2018-09-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-02-12 | Open Hole/Barefoot Completion | 1089.00 | 1102.00 | 0 |
1982-02-13 | Perforation | 1072.50 | 1073.00 | 7 |
1982-02-13 | Perforation | 1077.20 | 1077.70 | 7 |
1982-02-13 | Perforation | 1092.30 | 1093.00 | 13 |
1982-02-15 | Fracture | 1023.00 | 1102.00 | 0 |
1982-02-17 | Packing Device Capped w/Cement | 1062.00 | 1070.00 | 0 |
1983-03-22 | Perforation | 1072.50 | 1073.00 | 7 |
1983-03-22 | Perforation | 1077.20 | 1077.70 | 7 |
1983-03-23 | Perforation | 1092.30 | 1093.00 | 13 |
1983-03-24 | Open Hole/Barefoot Completion | 1089.00 | 1988.00 | 0 |
1983-03-24 | Cement Squeeze | 1023.00 | 1988.00 | 0 |
1982-02-13 | Perforation | 1023.00 | 1025.50 | 7 |
1983-05-20 | Perforation | 1755.00 | 1757.00 | 7 |
1983-05-20 | Perforation | 1770.00 | 1771.00 | 7 |
1983-05-20 | Perforation | 1772.00 | 1774.00 | 7 |
1983-05-20 | Perforation | 1776.00 | 1777.00 | 7 |
1983-05-20 | Perforation | 1780.00 | 1782.00 | 7 |
1983-05-20 | Perforation | 1784.00 | 1786.00 | 7 |
1983-05-20 | Perforation | 1788.00 | 1789.00 | 7 |
1983-05-21 | Acid Treatment | 1755.00 | 1789.00 | 0 |
1983-05-27 | Perforation | 1753.00 | 1755.00 | 7 |
1983-05-28 | Fracture | 1753.00 | 1757.00 | 0 |
1982-02-13 | Perforation | 1031.70 | 1032.20 | 7 |
1983-05-30 | Packing Device Capped w/Cement | 1742.00 | 1750.00 | 0 |
1984-11-16 | Perforation | 753.00 | 757.00 | 13 |
1984-11-17 | Fracture | 753.00 | 757.00 | 0 |
1984-11-21 | Perforation | 764.50 | 765.00 | 13 |
1984-11-21 | Cement Squeeze | 764.50 | 765.00 | 0 |
1984-11-23 | Perforation | 753.00 | 757.00 | 13 |
1984-11-25 | Acid Treatment | 753.00 | 757.00 | 0 |
1984-11-27 | Perforation | 736.00 | 738.00 | 13 |
1984-11-27 | Fracture | 736.00 | 738.00 | 0 |
1993-02-21 | Packing Device Capped w/Cement | 742.00 | 750.00 | 0 |
1982-02-13 | Perforation | 1036.70 | 1037.30 | 7 |
1993-02-21 | Packing Device Capped w/Cement | 718.00 | 726.00 | 0 |
1993-02-21 | Perforation | 371.00 | 372.00 | 72 |
1993-02-21 | Cement Squeeze | 371.00 | 372.00 | 0 |
1993-02-25 | Perforation | 351.00 | 354.00 | 13 |
1982-02-13 | Perforation | 1039.50 | 1040.20 | 7 |
1982-02-13 | Perforation | 1042.00 | 1046.00 | 7 |
1982-02-13 | Perforation | 1050.00 | 1050.50 | 7 |
1982-02-13 | Perforation | 1051.30 | 1052.30 | 7 |
1982-02-13 | Perforation | 1056.00 | 1057.30 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1091 | 0.0 | 0.0 | 0.0 |
1994 | 8541 | 0.0 | 0.0 | 0.0 |
1995 | 8449 | 0.0 | 0.0 | 0.0 |
1996 | 8701 | 0.0 | 0.0 | 0.0 |
1997 | 8635 | 0.0 | 0.0 | 0.0 |
1998 | 8560 | 0.0 | 0.0 | 0.0 |
1999 | 8123 | 0.0 | 0.0 | 0.0 |
2000 | 8609 | 0.0 | 0.0 | 0.0 |
2001 | 7511 | 0.0 | 0.0 | 0.0 |
2018 | 3 | 0.0 | 0.0 | 0.0 |
For data sources see[5]