X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806012106000

Well Details

Well ID: 0806012106000
Loading map...
Location: 00/06-21-080-01W6/0
Location Alias: 00/06-21-80-01 W6M
Location Alias 2: 00/06-21-080-01 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 01
Section: 21
County/Municipality: Municipal District of Fairview No. 136
Well Name: ESSO DUNVEGAN 6-21-80-1
Operator Name: Imperial Oil Resources Limited
License Number: 0117512
License Date: 1985-09-09
License Status: RecCertified
Spud Date: 1985-09-14
Final Drill Date: 1985-10-12
Well Total Depth: 2291.00 m
Surface Hole Latitude: 55.945675
Surface Hole Longitude: -118.095074

For data sources see[1][2]

Well History

Date Event
1985-09-09 Obtained License
1985-09-15 Lost Circulation Occurred
1985-09-17 Surface Casing Operation Performed
1985-10-01 Direction Drilling Operation Performed - Deviate
1985-10-12 Finished Drilling
1985-10-12 Well Mode changed to Drilled and Cased
1985-10-13 Well Log Performed
1985-10-14 Drill Stem Test Performed
1985-10-15 Drill Stem Test Performed
1985-10-16 Drill Stem Test Performed
1985-10-17 Drill Stem Test Performed
1985-10-20 Production Casing Operation Performed
1985-10-21 Rig Released
1985-11-30 Perforation Treatment Performed - Jet Perforation
1985-12-01 Perforation Treatment Performed - Jet Perforation
1985-12-03 Perforation Treatment Performed - Fractured
1986-01-01 Well Began Production
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Flowing
1986-03-13 Well Fluid changed to Crude Oil
1986-03-13 Well Mode changed to Suspended
1989-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-06 Plug Back Performed
1989-01-06 Well Log Performed
1989-01-07 Perforation Treatment Performed - Jet Perforation
1989-01-10 Perforation Treatment Performed - Cement Squeeze
1989-01-13 Perforation Treatment Performed - Jet Perforation
1989-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-19 Plug Back Performed
1989-01-19 Well Fluid changed to Crude Oil
1989-01-19 Well Log Performed
1989-01-19 Well Mode changed to Abandoned
1989-03-31 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-10-01 1886.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-30 Perforation 1975.60 1977.60 13
1989-01-19 Packing Device Capped w/Cement 1324.00 1332.00 0
1985-12-01 Perforation 1975.50 1977.50 13
1985-12-03 Fracture 1975.50 1977.60 0
1989-01-06 Packing Device Capped w/Cement 1957.00 1965.00 0
1989-01-07 Perforation 1345.00 1345.50 13
1989-01-07 Perforation 1360.00 1360.50 13
1989-01-10 Cement Squeeze 1345.00 1360.50 0
1989-01-13 Perforation 1351.00 1355.00 13
1989-01-15 Acid Treatment 1351.00 1355.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1236 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-09-15 Lost Circulation 32.00 35.00

For data sources see[7]

References