X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806031008003

Well Details

Well ID: 0806031008003
Loading map...
Location: 00/08-10-080-03W6/3
Location Alias: 00/08-10-80-03 W6M
Location Alias 2: 00/08-10-080-03 W6/03
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0077143
License Date: 1979-07-27
License Status: Suspension
Spud Date: 1979-08-05
Final Drill Date: 1979-08-20
Well Total Depth: 1635.00 m
Surface Hole Latitude: 55.918986
Surface Hole Longitude: -118.367022

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-27 Obtained License
1979-08-06 Lost Circulation Occurred
1979-08-20 Finished Drilling
1979-08-20 Well Log Performed
1979-08-20 Well Mode changed to Drilled and Cased
1979-08-22 Drill Stem Test Performed
1979-08-23 Production Casing Operation Performed
1979-09-07 Perforation Treatment Performed - Jet Perforation
1979-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-13 Perforation Treatment Performed - Jet Perforation
1979-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-17 Perforation Treatment Performed - Jet Perforation
1979-09-21 Perforation Treatment Performed - Fractured
1979-09-22 Perforation Treatment Performed - Jet Perforation
1979-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-28 Perforation Treatment Performed - Cement Squeeze
1986-05-30 Perforation Treatment Performed - Cement Squeeze
1986-06-02 Perforation Treatment Performed - Jet Perforation
1986-06-03 Perforation Treatment Performed - Acid Wash - No Pressure
1986-06-05 Perforation Treatment Performed - Fractured
1986-06-27 Perforation Treatment Performed - Jet Perforation
1986-06-30 Perforation Treatment Performed - Fractured
1993-07-31 Perforation Treatment Performed - Jet Perforation
1993-07-31 Well Log Performed
1993-08-01 Perforation Treatment Performed - Fractured
1993-08-02 Well Log Performed
1993-08-07 Well Began Production
1993-08-07 Well Fluid changed to Gas
1993-08-07 Well Mode changed to Flowing
1995-07-31 Well Fluid changed to Gas
1995-07-31 Well Mode changed to Suspended
2003-05-08 Well Fluid changed to Gas
2003-05-08 Well Mode changed to Flowing
2003-06-01 Well Fluid changed to Gas
2003-06-01 Well Mode changed to Pumping
2010-09-30 Well Fluid changed to Gas
2010-09-30 Well Mode changed to Suspended
2010-10-09 Well Log Performed
2010-10-13 Perforation Treatment Performed - Jet Perforation
2010-10-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-07 Perforation 1501.40 1501.80 4
1979-09-13 Perforation 1472.80 1473.70 4
1979-09-15 Acid Treatment 1472.80 1482.20 0
1979-09-17 Perforation 1465.50 1466.10 4
1979-09-17 Perforation 1460.60 1462.70 4
1979-09-17 Perforation 1459.10 1459.40 4
1979-09-17 Perforation 1455.70 1456.30 4
1979-09-17 Perforation 1450.50 1451.20 4
1979-09-21 Fracture 1450.50 1482.20 0
1979-09-22 Perforation 1437.10 1440.20 4
1979-09-24 Acid Treatment 1437.10 1440.20 0
1979-09-07 Perforation 1499.30 1499.60 4
1986-05-28 Cement Squeeze 1472.80 1482.20 0
1986-05-30 Cement Squeeze 1437.10 1466.10 0
1986-06-02 Perforation 1450.50 1451.20 9
1986-06-02 Perforation 1455.70 1456.30 9
1986-06-02 Perforation 1459.10 1459.30 9
1986-06-02 Perforation 1460.60 1462.70 9
1986-06-03 Acid Wash 1450.50 1462.70 0
1986-06-05 Fracture 1450.50 1462.70 0
1986-06-27 Perforation 1437.10 1440.10 9
1986-06-30 Fracture 1437.10 1440.10 0
1979-09-07 Perforation 1496.00 1496.60 4
1993-07-31 Perforation 1426.00 1430.00 13
1993-08-01 Fracture 1426.00 1430.00 0
2010-10-13 Perforation 1398.20 1398.40 2
2010-10-13 Perforation 1408.50 1408.70 2
2010-10-13 Perforation 1413.60 1413.80 2
2010-10-13 Perforation 1418.80 1419.00 2
2010-10-17 Fracture 1398.20 1398.40 0
2010-10-17 Fracture 1408.50 1408.70 0
2010-10-17 Fracture 1413.60 1413.80 0
2010-10-17 Fracture 1418.80 1419.00 0
1979-09-07 Perforation 1494.10 1494.70 4
1979-09-07 Perforation 1492.60 1492.90 4
1979-09-08 Acid Treatment 1492.60 1501.80 0
1979-09-13 Perforation 1481.60 1482.20 4
1979-09-13 Perforation 1479.50 1479.80 4
1979-09-13 Perforation 1475.50 1475.80 4

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1996 0.0 0.0 0.0
1994 1292 0.0 0.0 0.0
2003 5832 0.0 0.0 0.0
2004 8423 0.0 0.0 0.0
2005 7122 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 7893 0.0 0.0 0.0
2009 8525 0.0 0.0 0.0
2010 6369 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-06 Lost Circulation 131.00 200.00

For data sources see[6]

References