X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806031010000

Well Details

Well ID: 0806031010000
Loading map...
Location: 00/10-10-080-03W6/0
Location Alias: 00/10-10-80-03 W6M
Location Alias 2: 00/10-10-080-03 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL ET AL 10D DUNVEG 10-10-80-3
Operator Name: Canadian Natural Resources Limited
License Number: 0365472
License Date: 2006-11-06
License Status: Suspension
Spud Date: 2007-02-05
Final Drill Date: 2007-02-13
Well Total Depth: 1875.00 m
Surface Hole Latitude: 55.919171
Surface Hole Longitude: -118.360862

For data sources see[1][2]

Well History

Date Event
2006-11-06 Obtained License
2007-02-05 Lost Circulation Occurred
2007-02-06 Surface Casing Operation Performed
2007-02-07 Direction Drilling Operation Performed - Deviate
2007-02-13 Finished Drilling
2007-02-13 Well Mode changed to Drilled and Cased
2007-02-14 Well Log Performed
2007-02-15 Production Casing Operation Performed
2007-02-15 Rig Released
2007-03-10 Perforation Treatment Performed - Jet Perforation
2007-03-10 Well Log Performed
2007-03-12 Well Log Performed
2007-03-15 Perforation Treatment Performed - Fractured
2007-07-07 Well Began Production
2007-07-07 Well Fluid changed to Gas
2007-07-07 Well Mode changed to Flowing
2008-11-29 Well Fluid changed to Gas
2008-11-29 Well Mode changed to Pumping
2012-11-01 Well Fluid changed to Gas
2012-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-02-07 317.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-03-10 Perforation 1726.00 1728.00 4
2007-03-10 Perforation 1734.00 1739.50 4
2007-03-10 Perforation 1741.00 1751.00 4
2007-03-10 Perforation 1753.00 1761.00 4
2007-03-10 Perforation 1763.00 1766.00 4
2007-03-10 Perforation 1769.00 1774.00 4
2007-03-10 Perforation 1776.40 1776.50 4
2007-03-15 Fracture 1726.00 1776.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3 0.0 0.0 0.0
2008 135 0.0 0.0 0.0
2009 7135 0.0 0.0 0.0
2010 8567 0.0 0.0 0.0
2011 8438 0.0 0.0 0.0
2012 7007 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2007-02-05 Lost Circulation 107.00 317.00

For data sources see[7]

References