If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806032206020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.946821,"lon":-118.383451,"icon":""}]} |
Location: 02/06-22-080-03W6/0 | |
Location Alias: 02/06-22-80-03 W6M | |
Location Alias 2: 02/06-22-080-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CNRL 0-0-0-0 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0115913 | |
License Date: 1985-07-05 | |
License Status: Amended | |
Spud Date: 1985-07-09 | |
Final Drill Date: 1985-07-28 | |
Well Total Depth: 2340.00 m | |
Surface Hole Latitude: 55.946821 | |
Surface Hole Longitude: -118.383451 |
Date | Event |
---|---|
1985-07-05 | Obtained License |
1985-07-11 | Surface Casing Operation Performed |
1985-07-28 | Finished Drilling |
1985-07-29 | Well Log Performed |
1985-07-30 | Drill Stem Test Performed |
1985-07-31 | Drill Stem Test Performed |
1985-08-01 | Drill Stem Test Performed |
1985-08-02 | Drill Stem Test Performed |
1985-08-04 | Drill Stem Test Performed |
1985-08-05 | Drill Stem Test Performed |
1985-08-06 | Drill Stem Test Performed |
1985-08-07 | Drill Stem Test Performed |
1985-08-07 | Plug Back Performed |
1985-08-07 | Well Log Performed |
1985-08-08 | Drill Stem Test Performed |
1985-08-09 | Production Casing Operation Performed |
1985-08-09 | Rig Released |
1985-08-09 | Well Mode changed to Drilled and Cased |
1986-02-08 | Well Log Performed |
1986-02-10 | Perforation Treatment Performed - Jet Perforation |
1986-02-12 | Perforation Treatment Performed - Fractured |
1986-02-12 | Well Began Production |
1986-02-12 | Well Fluid changed to Crude Oil |
1986-02-12 | Well Mode changed to Flowing |
1986-02-15 | Well Fluid changed to Crude Oil |
1986-02-15 | Well Mode changed to Suspended |
1986-02-17 | Perforation Treatment Performed - Jet Perforation |
1986-02-27 | Perforation Treatment Performed - Fractured |
1986-02-27 | Well Log Performed |
1993-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-02-08 | Plug Back Performed |
1993-02-08 | Well Fluid changed to Crude Oil |
1993-02-08 | Well Mode changed to Abandoned Zone |
1993-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-09 | Perforation Treatment Performed - Jet Perforation |
1993-02-11 | Perforation Treatment Performed - Fractured |
1993-02-14 | Perforation Treatment Performed - Jet Perforation |
1993-02-15 | Perforation Treatment Performed - Fractured |
1996-05-15 | Well Log Performed |
1996-05-16 | Perforation Treatment Performed - Jet Perforation |
1996-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-05-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-05-18 | Perforation Treatment Performed - Jet Perforation |
1996-05-18 | Well Log Performed |
2001-11-19 | Well Log Performed |
2001-11-20 | Well Log Performed |
2001-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-11-22 | Perforation Treatment Performed - Cement Squeeze |
2001-11-22 | Plug Back Performed |
2001-11-25 | Perforation Treatment Performed - Jet Perforation |
2001-11-25 | Well Log Performed |
2001-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-12-02 | Well Log Performed |
2001-12-04 | Well Log Performed |
2001-12-06 | Perforation Treatment Performed - Fractured |
2001-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-12-09 | Perforation Treatment Performed - Fractured |
2001-12-12 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-10 | Perforation | 1614.00 | 1619.00 | 9 |
1993-02-11 | Fracture | 1494.00 | 1497.00 | 0 |
1993-02-14 | Perforation | 1463.30 | 1466.00 | 13 |
1993-02-15 | Fracture | 1463.30 | 1466.00 | 0 |
1996-05-16 | Perforation | 1055.50 | 1057.50 | 14 |
1996-05-17 | Acid Treatment | 1055.50 | 1057.50 | 0 |
1996-05-18 | Perforation | 1057.00 | 1059.50 | 14 |
1996-05-18 | Acid Treatment | 1055.50 | 1059.50 | 0 |
2001-11-22 | Acid Treatment | 1055.00 | 1059.50 | 0 |
2001-11-22 | Cement Squeeze | 1055.00 | 1059.50 | 0 |
2001-11-25 | Perforation | 1431.30 | 1435.00 | 17 |
1986-02-12 | Fracture | 1614.00 | 1619.00 | 0 |
2001-11-25 | Perforation | 1437.00 | 1438.50 | 17 |
2001-11-25 | Perforation | 1447.50 | 1449.00 | 17 |
2001-11-25 | Perforation | 1458.50 | 1461.50 | 17 |
2001-11-25 | Perforation | 1477.00 | 1478.00 | 17 |
2001-11-28 | Acid Treatment | 1477.00 | 1478.00 | 0 |
2001-12-06 | Fracture | 1458.50 | 1461.50 | 0 |
2001-12-07 | Acid Treatment | 1447.50 | 1449.00 | 0 |
2001-12-09 | Fracture | 1431.30 | 1438.50 | 0 |
1986-02-17 | Perforation | 1531.00 | 1533.00 | 9 |
1986-02-17 | Perforation | 1534.00 | 1540.00 | 9 |
1986-02-27 | Fracture | 1531.00 | 1540.00 | 0 |
1993-02-08 | Packing Device Capped w/Cement | 1602.00 | 1610.00 | 0 |
1993-02-08 | Packing Device Capped w/Cement | 1517.00 | 1525.00 | 0 |
1993-02-09 | Perforation | 1494.00 | 1497.00 | 13 |
1993-02-09 | Acid Treatment | 1494.00 | 1497.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 56 | 0.0 | 0.0 | 0.0 |
For data sources see[5]