X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806032206023

Well Details

Well ID: 0806032206023
Loading map...
Location: 02/06-22-080-03W6/3
Location Alias: 02/06-22-80-03 W6M
Location Alias 2: 02/06-22-080-03 W6/03
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 03
Section: 22
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0115913
License Date: 1985-07-05
License Status: Amended
Spud Date: 1985-07-09
Final Drill Date: 1985-07-28
Well Total Depth: 2340.00 m
Surface Hole Latitude: 55.946821
Surface Hole Longitude: -118.383451

For data sources see[1][2]

Well History

Date Event
1985-07-05 Obtained License
1985-07-11 Surface Casing Operation Performed
1985-07-28 Finished Drilling
1985-07-29 Well Log Performed
1985-07-30 Drill Stem Test Performed
1985-07-31 Drill Stem Test Performed
1985-08-01 Drill Stem Test Performed
1985-08-02 Drill Stem Test Performed
1985-08-04 Drill Stem Test Performed
1985-08-05 Drill Stem Test Performed
1985-08-06 Drill Stem Test Performed
1985-08-07 Drill Stem Test Performed
1985-08-07 Plug Back Performed
1985-08-07 Well Log Performed
1985-08-08 Drill Stem Test Performed
1985-08-09 Production Casing Operation Performed
1985-08-09 Rig Released
1986-02-08 Well Log Performed
1986-02-10 Perforation Treatment Performed - Jet Perforation
1986-02-12 Perforation Treatment Performed - Fractured
1986-02-17 Perforation Treatment Performed - Jet Perforation
1986-02-27 Perforation Treatment Performed - Fractured
1986-02-27 Well Log Performed
1993-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-08 Plug Back Performed
1993-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-09 Perforation Treatment Performed - Jet Perforation
1993-02-11 Perforation Treatment Performed - Fractured
1993-02-14 Perforation Treatment Performed - Jet Perforation
1993-02-15 Perforation Treatment Performed - Fractured
1996-05-15 Well Log Performed
1996-05-16 Perforation Treatment Performed - Jet Perforation
1996-05-16 Well Mode changed to Drilled and Cased
1996-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-18 Perforation Treatment Performed - Jet Perforation
1996-05-18 Well Log Performed
1996-06-26 Well Began Production
1996-06-26 Well Fluid changed to Gas
1996-06-26 Well Mode changed to Flowing
2001-06-25 Well Fluid changed to Gas
2001-06-25 Well Mode changed to Suspended
2001-11-19 Well Log Performed
2001-11-20 Well Log Performed
2001-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-22 Perforation Treatment Performed - Cement Squeeze
2001-11-22 Plug Back Performed
2001-11-22 Well Fluid changed to Gas
2001-11-22 Well Mode changed to Abandoned Zone
2001-11-25 Perforation Treatment Performed - Jet Perforation
2001-11-25 Well Log Performed
2001-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-02 Well Log Performed
2001-12-04 Well Log Performed
2001-12-06 Perforation Treatment Performed - Fractured
2001-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-09 Perforation Treatment Performed - Fractured
2001-12-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-10 Perforation 1614.00 1619.00 9
1993-02-11 Fracture 1494.00 1497.00 0
1993-02-14 Perforation 1463.30 1466.00 13
1993-02-15 Fracture 1463.30 1466.00 0
1996-05-16 Perforation 1055.50 1057.50 14
1996-05-17 Acid Treatment 1055.50 1057.50 0
1996-05-18 Perforation 1057.00 1059.50 14
1996-05-18 Acid Treatment 1055.50 1059.50 0
2001-11-22 Acid Treatment 1055.00 1059.50 0
2001-11-22 Cement Squeeze 1055.00 1059.50 0
2001-11-25 Perforation 1431.30 1435.00 17
1986-02-12 Fracture 1614.00 1619.00 0
2001-11-25 Perforation 1437.00 1438.50 17
2001-11-25 Perforation 1447.50 1449.00 17
2001-11-25 Perforation 1458.50 1461.50 17
2001-11-25 Perforation 1477.00 1478.00 17
2001-11-28 Acid Treatment 1477.00 1478.00 0
2001-12-06 Fracture 1458.50 1461.50 0
2001-12-07 Acid Treatment 1447.50 1449.00 0
2001-12-09 Fracture 1431.30 1438.50 0
1986-02-17 Perforation 1531.00 1533.00 9
1986-02-17 Perforation 1534.00 1540.00 9
1986-02-27 Fracture 1531.00 1540.00 0
1993-02-08 Packing Device Capped w/Cement 1602.00 1610.00 0
1993-02-08 Packing Device Capped w/Cement 1517.00 1525.00 0
1993-02-09 Perforation 1494.00 1497.00 13
1993-02-09 Acid Treatment 1494.00 1497.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2588 0.0 0.0 0.0
1997 2863 0.0 0.0 0.0
1998 3397 0.0 0.0 0.0

For data sources see[5]

References