If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806032806004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.960229,"lon":-118.410966,"icon":""}]} |
Location: 00/06-28-080-03W6/4 | |
Location Alias: 00/06-28-80-03 W6M | |
Location Alias 2: 00/06-28-080-03 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CNRL ET AL DUNVEG 6-28-80-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0042544 | |
License Date: 1972-05-17 | |
License Status: Suspension | |
Spud Date: 1972-05-25 | |
Final Drill Date: 1972-06-13 | |
Well Total Depth: 1676.40 m | |
Surface Hole Latitude: 55.960229 | |
Surface Hole Longitude: -118.410966 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-05-17 | Obtained License |
1972-06-09 | Drill Stem Test Performed |
1972-06-10 | Drill Stem Test Performed |
1972-06-13 | Finished Drilling |
1972-06-13 | Well Mode changed to Drilled and Cased |
1972-06-14 | Well Log Performed |
1972-06-15 | Production Casing Operation Performed |
1972-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-08-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1972-08-22 | Perforation Treatment Performed - Jet Perforation |
1972-09-08 | Perforation Treatment Performed - Fractured |
1972-09-27 | Perforation Treatment Performed - Condensate Squeeze |
1972-09-29 | Perforation Treatment Performed - Jet Perforation |
1972-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-09-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1972-10-01 | Perforation Treatment Performed - Fractured |
1972-10-22 | Perforation Treatment Performed - Jet Perforation |
1972-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-11-10 | Perforation Treatment Performed - Jet Perforation |
1979-07-18 | Perforation Treatment Performed - Chemical Squeeze |
1986-11-19 | Well Log Performed |
1986-11-21 | Perforation Treatment Performed - Cement Squeeze |
1986-11-21 | Plug Back Performed |
1986-12-05 | Perforation Treatment Performed - Cement Squeeze |
1986-12-05 | Plug Back Performed |
1986-12-07 | Perforation Treatment Performed - Jet Perforation |
1986-12-09 | Perforation Treatment Performed - Fractured |
1986-12-09 | Well Log Performed |
1987-01-12 | Well Began Production |
1987-01-12 | Well Fluid changed to Gas |
1987-01-12 | Well Mode changed to Flowing |
2019-02-01 | Well Fluid changed to Gas |
2019-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-08-22 | Perforation | 1528.60 | 1531.00 | 3 |
1972-10-22 | Perforation | 1486.80 | 1488.60 | 7 |
1972-10-29 | Acid Treatment | 1486.80 | 1488.60 | 0 |
1973-11-10 | Perforation | 920.50 | 921.70 | 7 |
1979-07-18 | Chemical Squeeze | 920.50 | 921.70 | 0 |
1986-11-21 | Cement Squeeze | 920.50 | 921.70 | 0 |
1986-12-05 | Cement Squeeze | 1486.80 | 1488.60 | 0 |
1986-12-07 | Perforation | 1474.00 | 1477.00 | 10 |
1986-12-09 | Fracture | 1474.00 | 1477.00 | 0 |
1972-08-22 | Acid Wash | 1528.60 | 1531.00 | 0 |
1972-08-22 | Acid Treatment | 1528.60 | 1531.00 | 0 |
1972-09-08 | Fracture | 1528.60 | 1531.00 | 0 |
1972-09-27 | Condensate Squeeze | 1528.60 | 1531.00 | 0 |
1972-09-29 | Perforation | 1486.80 | 1488.60 | 7 |
1972-09-30 | Acid Wash | 1486.80 | 1488.60 | 0 |
1972-09-30 | Acid Treatment | 1486.80 | 1488.60 | 0 |
1972-10-01 | Fracture | 1486.80 | 1488.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 6091 | 0.0 | 0.0 | 0.0 |
1988 | 7867 | 0.0 | 0.0 | 0.0 |
1989 | 7107 | 0.0 | 0.0 | 0.0 |
1990 | 6576 | 0.0 | 0.0 | 0.0 |
1991 | 5437 | 0.0 | 0.0 | 0.0 |
1992 | 8011 | 0.0 | 0.0 | 0.0 |
1993 | 7365 | 0.0 | 0.0 | 0.0 |
1994 | 6399 | 0.0 | 0.0 | 0.0 |
1995 | 7712 | 0.0 | 0.0 | 0.0 |
1996 | 7735 | 0.0 | 0.0 | 0.0 |
1997 | 8012 | 0.0 | 0.0 | 0.0 |
1998 | 7984 | 0.0 | 0.0 | 0.0 |
1999 | 7268 | 0.0 | 0.0 | 0.0 |
2000 | 7213 | 0.0 | 0.0 | 0.0 |
2001 | 6861 | 0.0 | 0.0 | 0.0 |
2002 | 8201 | 0.0 | 0.0 | 0.0 |
2003 | 8568 | 0.0 | 0.0 | 0.0 |
2004 | 8691 | 0.0 | 0.0 | 0.0 |
2005 | 8535 | 0.0 | 0.0 | 0.0 |
2006 | 8663 | 0.0 | 0.0 | 0.0 |
2007 | 8653 | 0.0 | 0.0 | 0.0 |
2008 | 8457 | 0.0 | 0.0 | 0.0 |
2009 | 8595 | 0.0 | 0.0 | 0.0 |
2010 | 8564 | 0.0 | 0.0 | 0.0 |
2011 | 8425 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 7522 | 0.0 | 0.0 | 0.0 |
2014 | 8660 | 0.0 | 0.0 | 0.0 |
2015 | 8471 | 0.0 | 0.0 | 0.0 |
2016 | 8203 | 0.0 | 0.0 | 0.0 |
2017 | 8558 | 0.0 | 0.0 | 0.0 |
2018 | 3575 | 0.0 | 0.0 | 0.0 |
For data sources see[5]