If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806080306003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.902786,"lon":-119.170492,"icon":""}]} |
Location: 00/06-03-080-08W6/3 | |
Location Alias: 00/06-03-80-08 W6M | |
Location Alias 2: 00/06-03-080-08 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 080 | |
Meridian: 6 | |
Range: 08 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: R S R MIRAGE 6-3-80-8 | |
Operator Name: Rising Star Resources Ltd. | |
License Number: 0308080 | |
License Date: 2004-05-05 | |
License Status: Issued | |
Spud Date: 2004-06-19 | |
Final Drill Date: 2004-06-25 | |
Well Total Depth: 1572.00 m | |
Surface Hole Latitude: 55.902786 | |
Surface Hole Longitude: -119.170492 |
Date | Event |
---|---|
2004-05-05 | Obtained License |
2004-06-20 | Surface Casing Operation Performed |
2004-06-21 | Direction Drilling Operation Performed - Deviate |
2004-06-25 | Finished Drilling |
2004-06-25 | Lost Circulation Occurred |
2004-06-25 | Well Mode changed to Drilled and Cased |
2004-06-26 | Well Log Performed |
2004-06-27 | Production Casing Operation Performed |
2004-06-27 | Rig Released |
2004-06-29 | Well Log Performed |
2004-07-23 | Well Log Performed |
2004-07-24 | Perforation Treatment Performed - Jet Perforation |
2004-07-24 | Well Log Performed |
2004-07-25 | Perforation Treatment Performed - Remedial Casing |
2004-07-27 | Well Log Performed |
2004-07-28 | Perforation Treatment Performed - Jet Perforation |
2004-07-28 | Perforation Treatment Performed - Remedial Casing |
2004-07-29 | Perforation Treatment Performed - Jet Perforation |
2004-07-29 | Perforation Treatment Performed - Remedial Casing |
2004-07-29 | Well Log Performed |
2004-08-03 | Well Log Performed |
2004-08-04 | Well Log Performed |
2004-08-05 | Perforation Treatment Performed - Jet Perforation |
2004-08-10 | Perforation Treatment Performed - Fractured |
2004-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-18 | Well Log Performed |
2004-08-19 | Perforation Treatment Performed - Jet Perforation |
2004-08-19 | Well Log Performed |
2004-08-27 | Perforation Treatment Performed - Fractured |
2004-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-08 | Perforation Treatment Performed - Jet Perforation |
2004-09-08 | Well Log Performed |
2005-02-23 | Well Began Production |
2005-02-23 | Well Fluid changed to Gas |
2005-02-23 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-06-21 | 816.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-07-24 | Perforation | 1110.00 | 1111.00 | 17 |
2004-08-19 | Perforation | 1271.00 | 1275.50 | 17 |
2004-08-27 | Fracture | 1271.00 | 1275.50 | 0 |
2004-09-08 | Packing Device Capped w/Cement | 1257.00 | 1265.00 | 0 |
2004-09-08 | Packing Device Capped w/Cement | 1092.00 | 1100.00 | 0 |
2004-09-08 | Perforation | 405.50 | 410.50 | 17 |
2004-07-25 | Remedial Casing Cementing | 1110.00 | 1111.00 | 0 |
2004-07-28 | Perforation | 610.00 | 611.00 | 17 |
2004-07-28 | Remedial Casing Cementing | 610.00 | 611.00 | 0 |
2004-07-29 | Perforation | 460.00 | 461.00 | 17 |
2004-07-29 | Remedial Casing Cementing | 460.00 | 461.00 | 0 |
2004-08-05 | Perforation | 1431.00 | 1436.00 | 17 |
2004-08-10 | Fracture | 1431.00 | 1436.00 | 0 |
2004-08-18 | Packing Device Capped w/Cement | 1412.00 | 1420.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 7270 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8331 | 0.0 | 0.0 | 0.0 |
2008 | 8054 | 0.0 | 0.0 | 0.0 |
2009 | 8171 | 0.0 | 0.0 | 0.0 |
2010 | 8074 | 0.0 | 0.0 | 0.0 |
2011 | 7626 | 0.0 | 0.0 | 0.0 |
2012 | 8098 | 0.0 | 0.0 | 0.0 |
2013 | 2878 | 0.0 | 0.0 | 0.0 |
2014 | 7027 | 0.0 | 0.0 | 0.0 |
2015 | 7979 | 0.0 | 0.0 | 0.0 |
2016 | 8206 | 0.0 | 0.0 | 0.0 |
2017 | 6286 | 0.0 | 0.0 | 0.0 |
2018 | 448 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2004-06-25 | Lost Circulation | 1532.00 | 1532.00 |
For data sources see[7]