X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806092808002

Well Details

Well ID: 0806092808002
Loading map...
Location: 00/08-28-080-09W6/2
Location Alias: 00/08-28-80-09 W6M
Location Alias 2: 00/08-28-080-09 W6/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 09
Section: 28
County/Municipality: Saddle Hills County
Well Name: R S R BILAW 8-28-80-9
Operator Name: Rising Star Resources Ltd.
License Number: 0096747
License Date: 1982-07-21
License Status: Suspension
Spud Date: 1982-07-29
Final Drill Date: 1982-08-09
Well Total Depth: 1525.00 m
Surface Hole Latitude: 55.960320
Surface Hole Longitude: -119.337094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-21 Obtained License
1982-08-08 Well Log Performed
1982-08-09 Finished Drilling
1982-08-10 Drill Stem Test Performed
1982-08-12 Production Casing Operation Performed
1982-09-04 Perforation Treatment Performed - Jet Perforation
1982-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-06 Perforation Treatment Performed - Jet Perforation
1982-09-07 Perforation Treatment Performed - Fractured
1982-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-14 Perforation Treatment Performed - Jet Perforation
1982-09-14 Well Mode changed to Drilled and Cased
1982-09-16 Perforation Treatment Performed - Jet Perforation
1982-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-18 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-04 Perforation 1498.00 1500.00 13
1982-09-16 Perforation 1284.00 1288.00 13
1982-09-17 Acid Treatment 1284.00 1288.00 0
1982-09-18 Cement Squeeze 1284.00 1288.00 0
1982-09-05 Acid Treatment 1498.00 1500.00 0
1982-09-05 Packing Device Capped w/Cement 1482.00 1490.00 0
1982-09-06 Perforation 1448.00 1450.00 13
1982-09-06 Perforation 1441.00 1444.00 13
1982-09-06 Acid Treatment 1441.00 1450.00 0
1982-09-07 Fracture 1441.00 1450.00 0
1982-09-14 Perforation 1381.60 1384.00 13
1982-09-14 Acid Treatment 1381.60 1384.00 0

For data sources see[4]



References