X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0806093014000

Well Details

Well ID: 0806093014000
Loading map...
Location: 00/14-30-080-09W6/0
Location Alias: 00/14-30-80-09 W6M
Location Alias 2: 00/14-30-080-09 W6/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 09
Section: 30
County/Municipality: Saddle Hills County
Well Name: BURLINGTON BILAWCHUK 14-30-80-9
Operator Name: Shoreline Energy Corp.
License Number: 0244029
License Date: 2000-11-04
License Status: Abandoned
Spud Date: 2000-11-11
Final Drill Date: 2000-11-18
Well Total Depth: 1633.00 m
Surface Hole Latitude: 55.967326
Surface Hole Longitude: -119.401648

For data sources see[1][2]

Well History

Date Event
2000-11-04 Obtained License
2000-11-12 Surface Casing Operation Performed
2000-11-18 Finished Drilling
2000-11-18 Well Log Performed
2000-11-19 Well Log Performed
2000-11-20 Production Casing Operation Performed
2000-11-21 Rig Released
2000-11-21 Well Mode changed to Drilled and Cased
2000-12-03 Perforation Treatment Performed - Jet Perforation
2000-12-03 Well Log Performed
2000-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-16 Well Began Production
2001-11-16 Well Fluid changed to Gas
2001-11-16 Well Mode changed to Flowing
2004-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-30 Well Fluid changed to Gas
2004-01-30 Well Mode changed to Pumping
2019-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Plug Back Performed
2019-02-07 Well Fluid changed to Gas
2019-02-07 Well Log Performed
2019-02-07 Well Mode changed to Abandoned Zone
2019-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-08 Perforation Treatment Performed - Cement Squeeze
2019-02-08 Plug Back Performed
2019-02-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-12-03 Perforation 1416.00 1419.00 20
2000-12-04 Acid Treatment 1416.00 1419.00 0
2004-01-17 Acid Treatment 1416.00 1419.00 0
2019-02-07 Packing Device Capped w/Cement 1395.80 1404.00 0
2019-02-07 Perforation 424.00 425.00 17
2019-02-08 Cement Squeeze 424.00 425.00 0
2019-02-08 Packing Device Capped w/Cement 363.80 419.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 937 0.0 0.0 0.0
2002 7676 0.0 0.0 0.0
2003 7990 0.0 0.0 0.0
2004 8415 0.0 0.0 0.0
2005 8347 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8327 0.0 0.0 0.0
2008 8688 0.0 0.0 0.0
2009 3311 0.0 0.0 0.0
2010 7511 0.0 0.0 0.0
2011 7148 0.0 0.0 0.0
2012 4579 0.0 0.0 0.0
2013 7590 0.0 0.0 0.0
2014 3799 0.0 0.0 0.0
2015 1693 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References