If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0815141311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.022658,"lon":-116.050767,"icon":""}]} |
Location: 00/11-13-081-14W5/0 | |
Location Alias: 00/11-13-81-14 W5M | |
Location Alias 2: 00/11-13-081-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 5 | |
Range: 14 | |
Section: 13 | |
County/Municipality: Northern Sunrise County | |
Well Name: PROSPER DAWSON 11-13-81-14 | |
Operator Name: Prosper Petroleum Ltd. | |
License Number: 0406588 | |
License Date: 2008-12-18 | |
License Status: Suspension | |
Spud Date: 2009-01-22 | |
Final Drill Date: 2009-01-28 | |
Well Total Depth: 888.00 m | |
Surface Hole Latitude: 56.022658 | |
Surface Hole Longitude: -116.050767 |
Date | Event |
---|---|
2008-12-18 | Obtained License |
2009-01-23 | Surface Casing Operation Performed |
2009-01-28 | Finished Drilling |
2009-01-28 | Well Log Performed |
2009-01-28 | Well Mode changed to Drilled and Cased |
2009-01-29 | Well Log Performed |
2009-01-30 | Production Casing Operation Performed |
2009-01-30 | Well Log Performed |
2009-02-01 | Rig Released |
2009-02-07 | Perforation Treatment Performed - Jet Perforation |
2009-02-07 | Well Log Performed |
2009-02-22 | Perforation Treatment Performed - Jet Perforation |
2009-02-23 | Well Log Performed |
2009-03-03 | Well Began Production |
2009-03-03 | Well Fluid changed to Crude Bitumen |
2009-03-03 | Well Mode changed to Pumping |
2009-03-14 | Perforation Treatment Performed - Chemical Squeeze |
2009-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2016-09-01 | Well Fluid changed to Crude Bitumen |
2016-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-07 | Perforation | 860.50 | 864.00 | 13 |
2009-02-07 | Perforation | 864.00 | 868.00 | 13 |
2009-02-22 | Perforation | 832.00 | 838.00 | 13 |
2009-03-14 | Chemical Squeeze | 832.00 | 838.00 | 0 |
2009-03-19 | Acid Treatment | 832.00 | 838.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1080 | 0.0 | 0.0 | 0.0 |
2010 | 2441 | 0.0 | 0.0 | 0.0 |
2011 | 2736 | 0.0 | 0.0 | 0.0 |
2012 | 3307 | 0.0 | 0.0 | 0.0 |
2013 | 1322 | 0.0 | 0.0 | 0.0 |
2014 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]