If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816011305025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.021503,"lon":-118.020133,"icon":""}]} |
Location: 02/05-13-081-01W6/5 | |
Location Alias: 02/05-13-81-01 W6M | |
Location Alias 2: 02/05-13-081-01 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 01 | |
Section: 13 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: ADAMANT MASTERS 2 WHITELAW 5-13-81-1 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0364274 | |
License Date: 2006-10-10 | |
License Status: Suspension | |
Spud Date: 2006-10-12 | |
Final Drill Date: 2006-10-17 | |
Well Total Depth: 1007.00 m | |
Surface Hole Latitude: 56.021503 | |
Surface Hole Longitude: -118.020133 |
Date | Event |
---|---|
2006-10-10 | Obtained License |
2006-10-13 | Surface Casing Operation Performed |
2006-10-17 | Finished Drilling |
2006-10-17 | Well Log Performed |
2006-10-17 | Well Mode changed to Drilled and Cased |
2006-10-18 | Drill Stem Test Performed |
2006-10-19 | Production Casing Operation Performed |
2006-10-19 | Rig Released |
2006-10-25 | Perforation Treatment Performed - Jet Perforation |
2006-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-27 | Perforation Treatment Performed - Jet Perforation |
2006-10-27 | Plug Back Performed |
2006-10-28 | Perforation Treatment Performed - Jet Perforation |
2007-06-08 | Perforation Treatment Performed - Jet Perforation |
2007-06-09 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-25 | Perforation | 945.00 | 950.00 | 17 |
2006-10-27 | Packing Device Capped w/Cement | 928.00 | 936.00 | 0 |
2006-10-27 | Perforation | 831.00 | 832.50 | 17 |
2006-10-27 | Perforation | 816.50 | 818.00 | 17 |
2006-10-28 | Perforation | 398.50 | 401.50 | 17 |
2007-06-08 | Perforation | 484.50 | 487.50 | 17 |
2007-06-08 | Perforation | 460.00 | 463.00 | 17 |
For data sources see[4]