If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816012105000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/05-21-081-01W6/0 | |
Location Alias: 00/05-21-81-01 W6M | |
Location Alias 2: 00/05-21-081-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 01 | |
Section: 21 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: PETRUS WHITELAW 5-21-81-1 | |
Operator Name: Tallahassee Exploration Inc. | |
License Number: 0326910 | |
License Date: 2005-02-24 | |
License Status: Suspension | |
Spud Date: 2005-03-05 | |
Final Drill Date: 2005-03-11 | |
Well Total Depth: 1120.00 m | |
Surface Hole Latitude: 56.029501 | |
Surface Hole Longitude: -118.099118 |
Date | Event |
---|---|
2005-02-24 | Obtained License |
2005-03-07 | Direction Drilling Operation Performed - Deviate |
2005-03-07 | Surface Casing Operation Performed |
2005-03-10 | Well Log Performed |
2005-03-11 | Finished Drilling |
2005-03-11 | Production Casing Operation Performed |
2005-03-11 | Rig Released |
2005-03-11 | Well Mode changed to Drilled and Cased |
2005-03-22 | Perforation Treatment Performed - Jet Perforation |
2005-03-24 | Perforation Treatment Performed - Jet Perforation |
2005-03-24 | Well Log Performed |
2005-03-25 | Perforation Treatment Performed - Jet Perforation |
2005-05-10 | Well Log Performed |
2005-05-16 | Well Began Production |
2005-05-16 | Well Fluid changed to Gas |
2005-05-16 | Well Mode changed to Flowing |
2013-09-01 | Well Fluid changed to Gas |
2013-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-03-07 | 212.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-03-22 | Perforation | 961.00 | 962.50 | 17 |
2005-03-24 | Perforation | 955.70 | 957.20 | 17 |
2005-03-25 | Perforation | 949.80 | 951.30 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 5358 | 0.0 | 0.0 | 0.0 |
2006 | 4947 | 0.0 | 0.0 | 0.0 |
2007 | 1920 | 0.0 | 0.0 | 0.0 |
2008 | 5678 | 0.0 | 0.0 | 0.0 |
2009 | 5374 | 0.0 | 0.0 | 0.0 |
2010 | 7028 | 0.0 | 0.0 | 0.0 |
2011 | 4086 | 0.0 | 0.0 | 0.0 |
For data sources see[6]