If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816012309020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.039591,"lon":-118.032369,"icon":""}]} |
Location: 02/09-23-081-01W6/0 | |
Location Alias: 02/09-23-81-01 W6M | |
Location Alias 2: 02/09-23-081-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 01 | |
Section: 23 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: ADAMANT 02 WHITELAW 9-23-81-1 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0364613 | |
License Date: 2006-10-17 | |
License Status: Suspension | |
Spud Date: 2006-10-23 | |
Final Drill Date: 2006-10-27 | |
Well Total Depth: 1010.00 m | |
Surface Hole Latitude: 56.039591 | |
Surface Hole Longitude: -118.032369 |
Date | Event |
---|---|
2006-10-17 | Obtained License |
2006-10-25 | Surface Casing Operation Performed |
2006-10-27 | Finished Drilling |
2006-10-27 | Well Mode changed to Drilled and Cased |
2006-10-28 | Production Casing Operation Performed |
2006-10-28 | Rig Released |
2006-11-01 | Well Log Performed |
2006-11-02 | Perforation Treatment Performed - Jet Perforation |
2006-11-03 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2006-11-03 | Perforation Treatment Performed - Jet Perforation |
2006-11-24 | Well Began Production |
2006-11-24 | Well Fluid changed to Gas |
2006-11-24 | Well Mode changed to Flowing |
2011-12-01 | Well Fluid changed to Gas |
2011-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-11-02 | Perforation | 845.00 | 847.00 | 17 |
2006-11-02 | Perforation | 825.50 | 827.50 | 17 |
2006-11-03 | Bridge Plug, No Cement | 818.10 | 819.90 | 0 |
2006-11-03 | Perforation | 591.50 | 593.50 | 17 |
2006-11-03 | Perforation | 540.50 | 543.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1464 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8039 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8039 | 0.0 | 0.0 | 0.0 |
For data sources see[5]