X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816012716003

Well Details

Well ID: 0816012716003
Loading map...
Location: 00/16-27-081-01W6/3
Location Alias: 00/16-27-81-01 W6M
Location Alias 2: 00/16-27-081-01 W6/03
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 27
County/Municipality: Municipal District of Fairview No. 136
Well Name: ADAMANT WHITELAW 16-27-81-1
Operator Name: Long Run Exploration Ltd.
License Number: 0378625
License Date: 2007-06-27
License Status: Suspension
Spud Date: 2007-07-03
Final Drill Date: 2007-07-06
Well Total Depth: 1060.00 m
Surface Hole Latitude: 56.055969
Surface Hole Longitude: -118.053423

For data sources see[1][2]

Well History

Date Event
2007-06-27 Obtained License
2007-07-04 Surface Casing Operation Performed
2007-07-06 Finished Drilling
2007-07-06 Well Mode changed to Drilled and Cased
2007-07-07 Drill Stem Test Performed
2007-07-07 Well Log Performed
2007-07-08 Drill Stem Test Performed
2007-07-09 Drill Stem Test Performed
2007-07-10 Production Casing Operation Performed
2007-07-10 Rig Released
2007-07-13 Perforation Treatment Performed - Jet Perforation
2007-09-09 Perforation Treatment Performed - Jet Perforation
2007-09-10 Well Began Production
2007-09-10 Well Fluid changed to Gas
2007-09-10 Well Mode changed to Flowing
2008-12-31 Well Fluid changed to Gas
2008-12-31 Well Mode changed to Suspended
2011-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-07 Perforation Treatment Performed - Jet Perforation
2011-07-07 Plug Back Performed
2011-07-07 Well Log Performed
2011-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-10 Perforation Treatment Performed - Jet Perforation
2011-07-10 Plug Back Performed
2011-07-10 Well Log Performed
2011-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-11 Plug Back Performed
2011-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-12 Plug Back Performed
2011-07-12 Well Fluid changed to Gas
2011-07-12 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-13 Perforation 1024.50 1026.00 17
2011-07-12 Packing Device Capped w/Cement 490.00 498.00 0
2011-07-12 Packing Device Capped w/Cement 426.00 434.00 0
2007-07-13 Perforation 1019.00 1021.50 17
2007-07-13 Perforation 504.00 505.00 17
2007-09-09 Perforation 439.00 440.00 17
2011-07-07 Perforation 988.00 992.00 17
2011-07-07 Packing Device Capped w/Cement 1005.00 1013.00 0
2011-07-10 Perforation 621.00 623.00 17
2011-07-10 Packing Device Capped w/Cement 975.00 983.00 0
2011-07-11 Packing Device Capped w/Cement 608.00 616.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 2184 0.0 0.0 0.0

For data sources see[5]

References