X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816013010000

Well Details

Well ID: 0816013010000
Loading map...
Location: 00/10-30-081-01W6/0
Location Alias: 00/10-30-81-01 W6M
Location Alias 2: 00/10-30-081-01 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 30
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL WHITELAW 10-30-81-1
Operator Name: Canadian Natural Resources Limited
License Number: 0071082
License Date: 1978-08-02
License Status: Abandoned
Spud Date: 1978-08-03
Final Drill Date: 1978-08-07
Well Total Depth: 796.00 m
Surface Hole Latitude: 56.051305
Surface Hole Longitude: -118.143114

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-02 Obtained License
1978-08-05 Lost Circulation Occurred
1978-08-07 Finished Drilling
1978-08-07 Well Mode changed to Drilled and Cased
1978-08-08 Drill Stem Test Performed
1978-08-09 Drill Stem Test Performed
1978-08-10 Drill Stem Test Performed
1978-08-11 Drill Stem Test Performed
1978-08-12 Drill Stem Test Performed
1978-08-13 Drill Stem Test Performed
1978-08-14 Production Casing Operation Performed
1978-10-08 Well Log Performed
1978-10-22 Perforation Treatment Performed - Jet Perforation
1978-10-23 Perforation Treatment Performed - Jet Perforation
1978-12-19 Well Began Production
1978-12-19 Well Fluid changed to Gas
1978-12-19 Well Mode changed to Flowing
1980-09-24 Perforation Treatment Performed - Jet Perforation
1980-09-24 Well Fluid changed to Gas
1980-09-24 Well Mode changed to Flowing
1984-03-14 Well Fluid changed to Gas
1984-03-14 Well Mode changed to Suspended
1984-09-20 Perforation Treatment Performed - Jet Perforation
1984-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Mode changed to Suspended
1992-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-23 Plug Back Performed
1992-08-23 Well Fluid changed to Gas
1992-08-23 Well Mode changed to Abandoned Zone
1992-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-22 Perforation 537.00 538.00 7
1984-09-21 Acid Treatment 440.00 442.00 0
1992-08-23 Packing Device Capped w/Cement 478.60 486.60 0
1992-08-23 Packing Device Capped w/Cement 427.00 435.00 0
1978-10-22 Perforation 532.00 533.00 7
1978-10-23 Perforation 588.50 589.50 7
1978-10-23 Perforation 503.50 505.00 7
1980-09-24 Perforation 715.30 716.30 7
1980-09-24 Perforation 681.50 682.50 7
1980-09-24 Perforation 618.00 619.00 7
1980-09-24 Perforation 620.00 621.00 7
1984-09-20 Perforation 440.00 442.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 6941 0.0 0.0 0.0
1980 4232 0.0 0.0 0.0
1983 1204 0.0 0.0 0.0
1984 2877 0.0 0.0 0.0
1985 3091 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-08-05 Lost Circulation 249.00 432.00

For data sources see[6]

References