X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816013104002

Well Details

Well ID: 0816013104002
Loading map...
Location: 00/04-31-081-01W6/2
Location Alias: 00/04-31-81-01 W6M
Location Alias 2: 00/04-31-081-01 W6/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 31
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL WHITELAW 4-31-81-1
Operator Name: Canadian Natural Resources Limited
License Number: 0065775
License Date: 1977-09-19
License Status: RecCertified
Spud Date: 1977-09-20
Final Drill Date: 1977-09-29
Well Total Depth: 798.60 m
Surface Hole Latitude: 56.058719
Surface Hole Longitude: -118.155035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-19 Obtained License
1977-09-22 Lost Circulation Occurred
1977-09-28 Drill Stem Test Performed
1977-09-29 Finished Drilling
1977-09-29 Production Casing Operation Performed
1977-09-29 Well Mode changed to Drilled and Cased
1978-03-24 Perforation Treatment Performed - Jet Perforation
1978-12-19 Well Began Production
1978-12-19 Well Fluid changed to Gas
1978-12-19 Well Mode changed to Flowing
1981-09-03 Perforation Treatment Performed - Cement Squeeze
1981-09-04 Perforation Treatment Performed - Jet Perforation
1986-07-28 Well Log Performed
1986-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-07-29 Plug Back Performed
1986-07-29 Well Log Performed
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-31 Perforation Treatment Performed - Cement Squeeze
1986-07-31 Well Fluid changed to Gas
1986-07-31 Well Mode changed to Abandoned Zone
1986-08-02 Well Log Performed
1986-08-03 Perforation Treatment Performed - Jet Perforation
1986-08-06 Well Log Performed
1986-08-09 Perforation Treatment Performed - Acid Wash - No Pressure
1986-08-10 Perforation Treatment Performed - Cement Squeeze
1986-08-10 Well Log Performed
1992-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-20 Plug Back Performed
1992-08-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-24 Perforation 452.00 452.60 13
1986-08-03 Perforation 618.10 620.00 13
1986-08-09 Acid Wash 618.10 620.00 0
1986-08-10 Cement Squeeze 503.50 505.30 0
1992-08-20 Packing Device Capped w/Cement 487.00 495.00 0
1978-03-24 Perforation 438.90 440.70 7
1981-09-03 Cement Squeeze 452.00 452.60 0
1981-09-04 Perforation 710.20 712.00 13
1986-07-29 Packing Device Capped w/Cement 696.40 704.40 0
1986-07-31 Acid Treatment 438.90 440.70 0
1986-07-31 Cement Squeeze 438.90 440.70 0
1986-08-03 Perforation 503.50 505.30 13
1986-08-03 Perforation 524.50 525.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 75 0.0 0.0 0.0
1979 6699 0.0 0.0 0.0
1980 5163 0.0 0.0 0.0
1981 4690 0.0 0.0 0.0
1982 6678 0.0 0.0 0.0
1983 4977 0.0 0.0 0.0
1984 5786 0.0 0.0 0.0
1985 6164 0.0 0.0 0.0
1986 4591 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-09-22 Lost Circulation 231.00 231.00

For data sources see[6]

References