X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816013210003

Well Details

Well ID: 0816013210003
Loading map...
Location: 00/10-32-081-01W6/3
Location Alias: 00/10-32-81-01 W6M
Location Alias 2: 00/10-32-081-01 W6/03
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 01
Section: 32
County/Municipality: Municipal District of Fairview No. 136
Well Name: WISER DOME WHITELAW 10-32-81-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0065008
License Date: 1977-07-28
License Status: Abandoned
Spud Date: 1977-08-01
Final Drill Date: 1977-08-06
Well Total Depth: 1045.50 m
Surface Hole Latitude: 56.065850
Surface Hole Longitude: -118.111662

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-28 Obtained License
1977-08-06 Finished Drilling
1977-08-06 Well Mode changed to Drilled and Cased
1977-08-07 Drill Stem Test Performed
1977-08-08 Drill Stem Test Performed
1977-08-09 Drill Stem Test Performed
1977-08-10 Kick Occurred
1977-08-13 Production Casing Operation Performed
1978-10-12 Well Log Performed
1978-10-13 Well Log Performed
1978-10-14 Perforation Treatment Performed - Jet Perforation
1978-10-15 Perforation Treatment Performed - Jet Perforation
1978-11-19 Perforation Treatment Performed - Jet Perforation
1979-10-31 Well Log Performed
1980-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-02 Perforation Treatment Performed - Cement Squeeze
1980-10-06 Perforation Treatment Performed - Jet Perforation
1980-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-01 Well Began Production
1980-11-01 Well Fluid changed to Gas
1980-11-01 Well Mode changed to Flowing
1982-08-23 Perforation Treatment Performed - Cement Squeeze
1982-08-27 Perforation Treatment Performed - Jet Perforation
1982-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-02 Perforation Treatment Performed - Cement Squeeze
1982-09-04 Perforation Treatment Performed - Jet Perforation
1982-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-10-06 Perforation Treatment Performed - Jet Perforation
1982-10-06 Well Fluid changed to Gas
1982-10-06 Well Mode changed to Abandoned Zone
1982-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-10 Perforation Treatment Performed - Jet Perforation
1982-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-24 Plug Back Performed
1994-10-24 Well Log Performed
1994-10-25 Perforation Treatment Performed - Jet Perforation
1994-10-25 Well Log Performed
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-10-26 Well Log Performed
1996-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-30 Perforation Treatment Performed - Jet Perforation
1996-03-30 Plug Back Performed
1996-03-30 Well Log Performed
2009-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-25 Plug Back Performed
2009-01-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-14 Perforation 1032.40 1033.60 13
1982-08-23 Cement Squeeze 842.10 844.60 0
1982-08-27 Perforation 991.80 993.70 7
1982-08-31 Packing Device Capped w/Cement 981.00 989.00 0
1982-09-01 Acid Treatment 866.20 869.90 0
1982-09-02 Cement Squeeze 866.20 869.90 0
1982-09-04 Perforation 915.60 918.40 7
1982-10-05 Packing Device Capped w/Cement 908.00 908.00 0
1982-10-06 Perforation 896.00 898.00 7
1982-10-07 Acid Treatment 896.00 898.00 0
1982-10-10 Perforation 896.00 898.00 7
1978-10-15 Perforation 877.20 880.90 7
1982-10-11 Acid Treatment 896.00 898.00 0
1994-10-24 Packing Device Capped w/Cement 827.00 835.00 0
1994-10-25 Perforation 722.40 724.80 13
1994-10-26 Perforation 629.70 635.20 13
1994-10-26 Perforation 660.20 662.00 13
1994-10-26 Perforation 697.50 703.50 13
1996-03-30 Packing Device Capped w/Cement 624.00 627.00 0
1996-03-30 Perforation 447.00 448.00 13
1996-03-30 Perforation 576.00 577.00 13
2009-01-25 Packing Device Capped w/Cement 562.00 570.00 0
1978-11-19 Perforation 1032.40 1032.80 13
2009-01-25 Packing Device Capped w/Cement 432.00 440.00 0
1980-09-25 Packing Device Capped w/Cement 1030.00 1030.00 0
1980-10-02 Cement Squeeze 877.20 880.90 0
1980-10-06 Perforation 866.20 869.90 7
1980-10-06 Perforation 842.10 844.60 7
1980-10-08 Acid Treatment 866.20 869.90 0
1982-08-23 Cement Squeeze 866.20 869.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1459 0.0 0.0 0.0
1981 6428 0.0 0.0 0.0
1982 4750 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-08-10 Kick 1045.50 1045.50

For data sources see[6]

References