X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816040803030

Well Details

Well ID: 0816040803030
Loading map...
Location: 03/03-08-081-04W6/0
Location Alias: 03/03-08-81-04 W6M
Location Alias 2: 03/03-08-081-04 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 04
Section: 08
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL DUNVEG 3-8-81-4
Operator Name: Canadian Natural Resources Limited
License Number: 0171152
License Date: 1994-10-05
License Status: Issued
Spud Date: 1994-10-05
Final Drill Date: 1994-10-13
Well Total Depth: 1165.00 m
Surface Hole Latitude: 56.000122
Surface Hole Longitude: -118.593210

For data sources see[1][2]

Well History

Date Event
1994-10-05 Lost Circulation Occurred
1994-10-05 Obtained License
1994-10-07 Surface Casing Operation Performed
1994-10-13 Drill Stem Test Performed
1994-10-13 Finished Drilling
1994-10-13 Well Log Performed
1994-10-13 Well Mode changed to Drilled and Cased
1994-10-14 Drill Stem Test Performed
1994-10-15 Drill Stem Test Performed
1994-10-16 Drill Stem Test Performed
1994-10-17 Production Casing Operation Performed
1994-10-17 Rig Released
1994-11-05 Perforation Treatment Performed - Jet Perforation
1994-11-05 Well Log Performed
1994-11-08 Perforation Treatment Performed - Fractured
1994-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-11 Perforation Treatment Performed - Jet Perforation
1994-11-11 Plug Back Performed
1994-11-11 Well Log Performed
1994-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-13 Perforation Treatment Performed - Jet Perforation
1994-11-13 Well Log Performed
1994-11-14 Perforation Treatment Performed - Remedial Casing
1994-11-18 Perforation Treatment Performed - Jet Perforation
1994-11-18 Well Log Performed
1994-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-23 Perforation Treatment Performed - Fractured
1994-11-25 Well Log Performed
1994-11-26 Perforation Treatment Performed - Cement Squeeze
1994-11-26 Plug Back Performed
1994-11-29 Perforation Treatment Performed - Jet Perforation
1994-11-29 Well Log Performed
1996-11-01 Well Began Production
1996-11-01 Well Fluid changed to Gas
1996-11-01 Well Mode changed to Flowing
2000-02-10 Well Log Performed
2000-02-11 Well Log Performed
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-16 Perforation Treatment Performed - Fractured
2000-02-21 Perforation Treatment Performed - Jet Perforation
2000-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-26 Perforation Treatment Performed - Jet Perforation
2000-02-26 Perforation Treatment Performed - Remedial Casing
2000-03-25 Well Fluid changed to Gas
2000-03-25 Well Mode changed to Flowing
2001-11-19 Well Fluid changed to Gas
2001-11-19 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-05 Perforation 1133.00 1136.00 18
1994-11-19 Acid Treatment 405.50 410.50 0
1994-11-23 Fracture 405.50 410.50 0
1994-11-26 Cement Squeeze 395.00 410.50 0
1994-11-29 Perforation 938.00 939.60 18
2000-02-12 Perforation 928.00 931.00 18
2000-02-16 Fracture 928.00 939.60 0
2000-02-21 Perforation 916.00 921.00 18
2000-02-23 Acid Treatment 916.00 921.00 0
2000-02-23 Acid Treatment 928.00 939.60 0
2000-02-26 Perforation 319.00 320.00 13
1994-11-08 Fracture 1133.00 1136.00 0
2000-02-26 Perforation 395.00 396.00 13
2000-02-26 Perforation 408.90 410.50 18
2000-02-26 Acid Treatment 319.00 410.50 0
2000-02-26 Remedial Casing Cementing 319.00 410.50 0
1994-11-11 Packing Device Capped w/Cement 1119.00 1127.00 0
1994-11-11 Perforation 395.00 396.00 13
1994-11-12 Acid Treatment 395.00 396.00 0
1994-11-13 Perforation 319.00 320.00 13
1994-11-14 Remedial Casing Cementing 319.00 320.00 0
1994-11-18 Perforation 405.50 408.00 18
1994-11-18 Perforation 408.90 410.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1240 0.0 0.0 0.0
1997 8335 0.0 0.0 0.0
1998 3415 0.0 0.0 0.0
2000 880 0.0 0.0 0.0
2001 7425 0.0 0.0 0.0
2002 7970 0.0 0.0 0.0
2003 7661 0.0 0.0 0.0
2004 7416 0.0 0.0 0.0
2005 8454 0.0 0.0 0.0
2006 8567 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8527 0.0 0.0 0.0
2009 7542 0.0 0.0 0.0
2010 8519 0.0 0.0 0.0
2011 8459 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8391 0.0 0.0 0.0
2014 8503 0.0 0.0 0.0
2015 7021 0.0 0.0 0.0
2016 8431 0.0 0.0 0.0
2017 8703 0.0 0.0 0.0
2018 8422 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 2144 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-10-05 Lost Circulation 78.00 85.00

For data sources see[6]

References