If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816040803032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.000122,"lon":-118.59321,"icon":""}]} |
Location: 03/03-08-081-04W6/2 | |
Location Alias: 03/03-08-81-04 W6M | |
Location Alias 2: 03/03-08-081-04 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 04 | |
Section: 08 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CNRL DUNVEG 3-8-81-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0171152 | |
License Date: 1994-10-05 | |
License Status: Issued | |
Spud Date: 1994-10-05 | |
Final Drill Date: 1994-10-13 | |
Well Total Depth: 1165.00 m | |
Surface Hole Latitude: 56.000122 | |
Surface Hole Longitude: -118.593210 |
Date | Event |
---|---|
1994-10-05 | Lost Circulation Occurred |
1994-10-05 | Obtained License |
1994-10-07 | Surface Casing Operation Performed |
1994-10-13 | Drill Stem Test Performed |
1994-10-13 | Finished Drilling |
1994-10-13 | Well Log Performed |
1994-10-13 | Well Mode changed to Drilled and Cased |
1994-10-14 | Drill Stem Test Performed |
1994-10-15 | Drill Stem Test Performed |
1994-10-16 | Drill Stem Test Performed |
1994-10-17 | Production Casing Operation Performed |
1994-10-17 | Rig Released |
1994-11-05 | Perforation Treatment Performed - Jet Perforation |
1994-11-05 | Well Log Performed |
1994-11-08 | Perforation Treatment Performed - Fractured |
1994-11-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-11-11 | Perforation Treatment Performed - Jet Perforation |
1994-11-11 | Plug Back Performed |
1994-11-11 | Well Log Performed |
1994-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-13 | Perforation Treatment Performed - Jet Perforation |
1994-11-13 | Well Log Performed |
1994-11-14 | Perforation Treatment Performed - Remedial Casing |
1994-11-18 | Perforation Treatment Performed - Jet Perforation |
1994-11-18 | Well Log Performed |
1994-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-23 | Perforation Treatment Performed - Fractured |
1994-11-25 | Well Log Performed |
1994-11-26 | Perforation Treatment Performed - Cement Squeeze |
1994-11-26 | Plug Back Performed |
1994-11-29 | Perforation Treatment Performed - Jet Perforation |
1994-11-29 | Well Log Performed |
2000-02-10 | Well Log Performed |
2000-02-11 | Well Log Performed |
2000-02-12 | Perforation Treatment Performed - Jet Perforation |
2000-02-16 | Perforation Treatment Performed - Fractured |
2000-02-21 | Perforation Treatment Performed - Jet Perforation |
2000-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-02-26 | Perforation Treatment Performed - Jet Perforation |
2000-02-26 | Perforation Treatment Performed - Remedial Casing |
2000-03-25 | Well Began Production |
2000-03-25 | Well Fluid changed to Gas |
2000-03-25 | Well Mode changed to Flowing |
2001-11-19 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-05 | Perforation | 1133.00 | 1136.00 | 18 |
1994-11-19 | Acid Treatment | 405.50 | 410.50 | 0 |
1994-11-23 | Fracture | 405.50 | 410.50 | 0 |
1994-11-26 | Cement Squeeze | 395.00 | 410.50 | 0 |
1994-11-29 | Perforation | 938.00 | 939.60 | 18 |
2000-02-12 | Perforation | 928.00 | 931.00 | 18 |
2000-02-16 | Fracture | 928.00 | 939.60 | 0 |
2000-02-21 | Perforation | 916.00 | 921.00 | 18 |
2000-02-23 | Acid Treatment | 916.00 | 921.00 | 0 |
2000-02-23 | Acid Treatment | 928.00 | 939.60 | 0 |
2000-02-26 | Perforation | 319.00 | 320.00 | 13 |
1994-11-08 | Fracture | 1133.00 | 1136.00 | 0 |
2000-02-26 | Perforation | 395.00 | 396.00 | 13 |
2000-02-26 | Perforation | 408.90 | 410.50 | 18 |
2000-02-26 | Acid Treatment | 319.00 | 410.50 | 0 |
2000-02-26 | Remedial Casing Cementing | 319.00 | 410.50 | 0 |
1994-11-11 | Packing Device Capped w/Cement | 1119.00 | 1127.00 | 0 |
1994-11-11 | Perforation | 395.00 | 396.00 | 13 |
1994-11-12 | Acid Treatment | 395.00 | 396.00 | 0 |
1994-11-13 | Perforation | 319.00 | 320.00 | 13 |
1994-11-14 | Remedial Casing Cementing | 319.00 | 320.00 | 0 |
1994-11-18 | Perforation | 405.50 | 408.00 | 18 |
1994-11-18 | Perforation | 408.90 | 410.50 | 18 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 6124 | 0.0 | 0.0 | 0.0 |
2001 | 6200 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-10-05 | Lost Circulation | 78.00 | 85.00 |
For data sources see[6]