X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816041206030

Well Details

Well ID: 0816041206030
Loading map...
Location: 03/06-12-081-04W6/0
Location Alias: 03/06-12-81-04 W6M
Location Alias 2: 03/06-12-081-04 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 04
Section: 12
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL TRIPLE DUNVEG 6-12-81-4
Operator Name: Canadian Natural Resources Limited
License Number: 0167940
License Date: 1994-06-16
License Status: Suspension
Spud Date: 1994-06-21
Final Drill Date: 1994-06-29
Well Total Depth: 1309.00 m
Surface Hole Latitude: 56.005656
Surface Hole Longitude: -118.484949

For data sources see[1][2]

Well History

Date Event
1994-06-16 Obtained License
1994-06-23 Surface Casing Operation Performed
1994-06-28 Drill Stem Test Performed
1994-06-28 Well Log Performed
1994-06-29 Finished Drilling
1994-06-29 Well Mode changed to Drilled and Cased
1994-06-30 Production Casing Operation Performed
1994-06-30 Rig Released
1994-07-15 Well Log Performed
1994-07-16 Perforation Treatment Performed - Jet Perforation
1994-07-18 Well Began Production
1994-07-18 Well Fluid changed to Crude Oil
1994-07-18 Well Mode changed to Flowing
1995-03-11 Well Fluid changed to Crude Oil
1995-03-11 Well Mode changed to Pumping
1999-06-01 Well Fluid changed to Crude Oil
1999-06-01 Well Mode changed to Suspended
2000-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-03 Perforation Treatment Performed - Cement Squeeze
2000-02-03 Well Fluid changed to Crude Oil
2000-02-03 Well Mode changed to Abandoned Zone
2000-02-06 Well Log Performed
2000-02-07 Perforation Treatment Performed - Jet Perforation
2000-02-08 Well Log Performed
2000-02-10 Perforation Treatment Performed - Jet Perforation
2001-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-27 Plug Back Performed
2001-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-28 Perforation Treatment Performed - Jet Perforation
2001-02-28 Plug Back Performed
2001-03-05 Perforation Treatment Performed - Jet Perforation
2003-10-17 Well Log Performed
2003-10-18 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-16 Perforation 1057.00 1058.50 14
2001-03-05 Perforation 1066.00 1069.00 17
2003-10-18 Perforation 1052.00 1054.00 17
2000-02-02 Acid Treatment 1057.00 1058.50 0
2000-02-03 Cement Squeeze 1057.00 1058.50 0
2000-02-07 Perforation 1135.00 1135.20 2
2000-02-07 Perforation 1135.00 1136.00 14
2000-02-10 Perforation 1278.00 1278.50 20
2001-02-27 Packing Device Capped w/Cement 1266.00 1274.00 0
2001-02-28 Packing Device Capped w/Cement 1122.00 1130.00 0
2001-02-28 Perforation 1066.00 1067.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3028 0.0 0.0 0.0
1995 6665 0.0 0.0 0.0
1996 8557 0.0 0.0 0.0
1997 8714 0.0 0.0 0.0
1998 4441 0.0 0.0 0.0

For data sources see[5]

References