If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816041913002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.039764,"lon":-118.624895,"icon":""}]} |
Location: 00/13-19-081-04W6/2 | |
Location Alias: 00/13-19-81-04 W6M | |
Location Alias 2: 00/13-19-081-04 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 04 | |
Section: 19 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CNRL 0-0-0-0 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0082786 | |
License Date: 1980-05-13 | |
License Status: Issued | |
Spud Date: 1980-08-30 | |
Final Drill Date: 1980-09-11 | |
Well Total Depth: 1538.00 m | |
Surface Hole Latitude: 56.039764 | |
Surface Hole Longitude: -118.624895 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-13 | Obtained License |
1980-08-31 | Lost Circulation Occurred |
1980-09-11 | Finished Drilling |
1980-09-11 | Well Mode changed to Drilled and Cased |
1980-09-12 | Well Log Performed |
1980-09-13 | Production Casing Operation Performed |
1980-10-19 | Perforation Treatment Performed - Jet Perforation |
1980-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-21 | Perforation Treatment Performed - Fractured |
1980-10-22 | Perforation Treatment Performed - Jet Perforation |
1980-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-24 | Perforation Treatment Performed - Fractured |
1980-10-25 | Perforation Treatment Performed - Jet Perforation |
1980-10-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-27 | Perforation Treatment Performed - Fractured |
1980-10-28 | Perforation Treatment Performed - Jet Perforation |
1980-10-28 | Perforation Treatment Performed - Selective Jet Perforations |
1980-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-30 | Perforation Treatment Performed - Fractured |
1980-11-17 | Well Began Production |
1980-11-17 | Well Fluid changed to Gas |
1980-11-17 | Well Mode changed to Flowing |
1999-11-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-19 | Perforation | 1471.00 | 1472.30 | 4 |
1980-10-23 | Acid Treatment | 1460.00 | 1465.20 | 0 |
1980-10-24 | Fracture | 1460.00 | 1465.20 | 0 |
1980-10-25 | Perforation | 1442.00 | 1444.50 | 9 |
1980-10-25 | Perforation | 1446.60 | 1448.00 | 6 |
1980-10-26 | Acid Treatment | 1442.00 | 1448.00 | 0 |
1980-10-27 | Fracture | 1442.00 | 1448.00 | 0 |
1980-10-28 | Perforation | 1428.40 | 1429.00 | 3 |
1980-10-28 | Selective Jet Perforations | 1426.90 | 1427.40 | 0 |
1980-10-28 | Perforation | 1425.50 | 1426.10 | 3 |
1980-10-28 | Perforation | 1424.00 | 1424.40 | 2 |
1980-10-19 | Perforation | 1476.80 | 1477.20 | 2 |
1980-10-28 | Perforation | 1422.00 | 1422.60 | 2 |
1980-10-28 | Perforation | 1420.40 | 1421.00 | 2 |
1980-10-29 | Acid Treatment | 1420.40 | 1429.00 | 0 |
1980-10-30 | Fracture | 1420.40 | 1429.00 | 0 |
1980-10-19 | Perforation | 1480.80 | 1483.00 | 6 |
1980-10-19 | Perforation | 1485.60 | 1487.00 | 4 |
1980-10-20 | Acid Treatment | 1471.00 | 1487.00 | 0 |
1980-10-21 | Fracture | 1471.00 | 1487.00 | 0 |
1980-10-22 | Perforation | 1460.00 | 1463.00 | 12 |
1980-10-22 | Perforation | 1463.50 | 1464.00 | 2 |
1980-10-22 | Perforation | 1464.80 | 1465.20 | 2 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 252 | 0.0 | 0.0 | 0.0 |
1981 | 7127 | 0.0 | 0.0 | 0.0 |
1982 | 7654 | 0.0 | 0.0 | 0.0 |
1983 | 7230 | 0.0 | 0.0 | 0.0 |
1984 | 4694 | 0.0 | 0.0 | 0.0 |
1985 | 7463 | 0.0 | 0.0 | 0.0 |
1986 | 4499 | 0.0 | 0.0 | 0.0 |
1987 | 5757 | 0.0 | 0.0 | 0.0 |
1988 | 7205 | 0.0 | 0.0 | 0.0 |
1989 | 6839 | 0.0 | 0.0 | 0.0 |
1990 | 4973 | 0.0 | 0.0 | 0.0 |
1991 | 5394 | 0.0 | 0.0 | 0.0 |
1992 | 7692 | 0.0 | 0.0 | 0.0 |
1993 | 8175 | 0.0 | 0.0 | 0.0 |
1994 | 8335 | 0.0 | 0.0 | 0.0 |
1995 | 8521 | 0.0 | 0.0 | 0.0 |
1996 | 7842 | 0.0 | 0.0 | 0.0 |
1997 | 5250 | 0.0 | 0.0 | 0.0 |
1998 | 8201 | 0.0 | 0.0 | 0.0 |
1999 | 6544 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-08-31 | Lost Circulation | 210.00 | 210.00 |
For data sources see[6]