X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816073312000

Well Details

Well ID: 0816073312000
Loading map...
Location: 00/12-33-081-07W6/0
Location Alias: 00/12-33-81-07 W6M
Location Alias 2: 00/12-33-081-07 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 07
Section: 33
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ PINGEL 12-33-81-7
Operator Name: Tourmaline Oil Corp.
License Number: 0485674
License Date: 2017-10-04
License Status: Issued
Spud Date: 2018-06-21
Final Drill Date: 2018-07-20
Well Total Depth: 3108.00 m
Surface Hole Latitude: 56.068344
Surface Hole Longitude: -119.073609

For data sources see[1][2]

Well History

Date Event
2017-10-04 Obtained License
2018-06-21 Lost Circulation Occurred
2018-06-23 Surface Casing Operation Performed
2018-07-11 Well Log Performed
2018-07-13 Direction Drilling Operation Performed - Deviate
2018-07-14 Direction Drilling Operation Performed - Horizontal
2018-07-15 Intermediate Casing Operation Performed
2018-07-20 Finished Drilling
2018-07-20 Well Log Performed
2018-07-20 Well Mode changed to Drilled and Cased
2018-07-21 Rig Released
2018-09-30 Perforation Treatment Performed - Open-Hole Completion
2018-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-10-06 Well Began Production
2018-10-06 Well Fluid changed to Crude Oil
2018-10-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-16 Precision Drilling Corporation 226 N/A Resumption
2018-06-21 Precision Drilling Corporation 226 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-13 861.70 Deviate (5 - 79 degrees)
2018-07-14 1283.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-30 Open Hole/Barefoot Completion 1326.00 3108.00 0
2018-10-01 Acid Treatment 1326.00 3108.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2061 0.0 0.0 0.0
2019 8391 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-21 Lost Circulation 90.00 127.00
2018-10-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References