X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816081205000

Well Details

Well ID: 0816081205000
Loading map...
Location: 00/05-12-081-08W6/0
Location Alias: 00/05-12-81-08 W6M
Location Alias 2: 00/05-12-081-08 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 08
Section: 12
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ MULLIGAN 5-12-81-8
Operator Name: Tourmaline Oil Corp.
License Number: 0459760
License Date: 2013-10-01
License Status: Suspension
Spud Date: 2013-11-17
Final Drill Date: 2013-11-28
Well Total Depth: 3065.00 m
Surface Hole Latitude: 55.992039
Surface Hole Longitude: -119.095389

For data sources see[1][2]

Well History

Date Event
2013-10-01 Obtained License
2013-11-18 Surface Casing Operation Performed
2013-11-20 Direction Drilling Operation Performed - Deviate
2013-11-22 Direction Drilling Operation Performed - Horizontal
2013-11-28 Finished Drilling
2013-11-28 Well Mode changed to Drilled and Cased
2013-11-29 Production Casing Operation Performed
2013-11-30 Rig Released
2013-12-05 Well Log Performed
2013-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-16 Well Log Performed
2015-03-05 Well Began Production
2015-03-05 Well Fluid changed to Crude Oil
2015-03-05 Well Mode changed to Pumping
2016-09-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-09-26 Perforation Treatment Performed - Fractured
2016-09-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-09-27 Perforation Treatment Performed - Fractured
2016-10-01 Well Log Performed
2019-05-31 Well Fluid changed to Crude Oil
2019-05-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-17 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-20 882.40 Deviate (5 - 79 degrees)
2013-11-22 1358.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-10 Multi-Stage Fracture 3014.80 3014.90 0
2013-12-14 Multi-Stage Fracture 2551.30 2551.40 0
2013-12-14 Multi-Stage Fracture 2496.40 2496.50 0
2013-12-14 Multi-Stage Fracture 2438.10 2438.20 0
2013-12-14 Multi-Stage Fracture 2380.30 2380.40 0
2013-12-15 Multi-Stage Fracture 2325.00 2325.10 0
2013-12-15 Multi-Stage Fracture 2256.70 2256.80 0
2013-12-15 Multi-Stage Fracture 2201.60 2201.70 0
2013-12-15 Multi-Stage Fracture 2147.20 2147.30 0
2013-12-15 Multi-Stage Fracture 2088.80 2088.90 0
2013-12-15 Multi-Stage Fracture 2035.10 2035.20 0
2013-12-10 Acid Treatment 3014.80 3014.90 0
2013-12-15 Multi-Stage Fracture 1968.60 1968.70 0
2013-12-15 Multi-Stage Fracture 1914.00 1914.10 0
2013-12-15 Multi-Stage Fracture 1862.60 1862.70 0
2013-12-15 Multi-Stage Fracture 1794.30 1794.40 0
2013-12-15 Multi-Stage Fracture 1739.80 1739.90 0
2013-12-15 Multi-Stage Fracture 1681.50 1681.60 0
2013-12-15 Multi-Stage Fracture 1639.40 1639.50 0
2016-09-26 Hydra Jet Perforation 1485.00 1485.10 0
2016-09-26 Hydra Jet Perforation 1465.00 1465.10 0
2016-09-26 Hydra Jet Perforation 1445.00 1445.10 0
2013-12-14 Multi-Stage Fracture 2959.90 2960.00 0
2016-09-26 Hydra Jet Perforation 1425.00 1425.10 0
2016-09-26 Hydra Jet Perforation 1405.00 1405.10 0
2016-09-26 Fracture 1485.00 1485.10 0
2016-09-26 Fracture 1465.00 1465.10 0
2016-09-26 Fracture 1445.00 1445.10 0
2016-09-26 Fracture 1425.00 1425.10 0
2016-09-26 Fracture 1405.00 1405.10 0
2016-09-27 Hydra Jet Perforation 1385.00 1385.10 0
2016-09-27 Hydra Jet Perforation 1365.00 1365.10 0
2016-09-27 Fracture 1385.00 1385.10 0
2013-12-14 Multi-Stage Fracture 2901.50 2901.60 0
2016-09-27 Fracture 1365.00 1365.10 0
2013-12-14 Multi-Stage Fracture 2846.60 2846.70 0
2013-12-14 Multi-Stage Fracture 2788.90 2789.00 0
2013-12-14 Multi-Stage Fracture 2722.50 2722.60 0
2013-12-14 Multi-Stage Fracture 2665.80 2665.90 0
2013-12-14 Multi-Stage Fracture 2609.00 2609.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-10 2016-09-27 1,204 4,800 N/A
2 2013-12-10 2013-12-15 1,204 0 N/A
3 2016-09-26 2016-09-27 1,204 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.2237 N/A
2 16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.2218 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.636 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.5939 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.843 N/A
Activator W Calfrac Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.0456 N/A
Methanol 67-56-1 100 0.0458 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0498 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0134 N/A
Water 7732-18-5 100 0.0142 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0818 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0881 N/A
Isopropanol 67-63-0 100 0.0889 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0881 N/A
Triethylene glycol 112-27-6 100 0.0889 N/A
Water 7732-18-5 100 0.0887 N/A
DWP-602 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0952 N/A
3 Sand (20/40) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 4.0557 N/A
Crystalline silica. quartz 14808-60-7 100 4.0557 N/A
Iron Oxide 1309-37-1 100 4.0557 N/A
Titanium Oxide 13463-67-7 100 4.0557 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 1.3769 N/A
Crystalline silica. quartz 14808-60-7 100 1.3769 N/A
Iron Oxide 1309-37-1 100 1.3769 N/A
Titanium Oxide 13463-67-7 100 1.3769 N/A
Yukon Black (20/40) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 3.7553 N/A
Furfuryl Alcohol 98-00-0 100 3.7553 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 1.8586 N/A
Water 7732-18-5 100 1.8586 N/A
HCR-2000 (33%) Synthetic Acid Canyon Technical Services Acid Refer to MSDS 9211 100 2.2225 N/A
Water 7732-18-5 100 2.2225 N/A
CAN-2300 Breaker (Enzyme HpH) Canyon Technical Services Breaker Cellulase Enzyme Solution Not Available 100 0.0026 N/A
CAN-2300 Breaker (Enzyme HpH. 10L:1L) Canyon Technical Services Breaker Cellulase Enzyme Solution Not Available 100 0.1173 N/A
Water 7732-18-5 100 0.1173 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0414 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0414 N/A
CAN-2102 pH Buffer (HpH) Canyon Technical Services Buffer Methyl Alcohol 67-56-1 100 0.1246 N/A
Sodium Hydroxide 1310-73-2 100 0.1246 N/A
Water 7732-18-5 100 0.1246 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.0938 N/A
CAN-1000 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Refer to MSDS 8141 100 0.0074 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.1641 N/A
Monoethanolamine 141-43-5 100 0.1641 N/A
Water 7732-18-5 100 0.1641 N/A
CAN-1200 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8251 100 0.0123 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0821 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0821 N/A
Methanol 67-56-1 100 0.0821 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0821 N/A
Water 7732-18-5 100 0.0821 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.4186 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0245 N/A
Cupric Chloride 7447-39-4 100 0.0245 N/A
Monoethanolamine 141-43-5 100 0.0245 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0037 N/A
Potassium Chloride 7447-40-7 100 0.0037 N/A
Water 7732-18-5 100 0.0037 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0131 N/A
Water 7732-18-5 100 0.0131 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-07 2013-12-13 Surface Water - Runoff 4061
2016-09-21 2016-09-26 Oilfield Produced Water 740

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4971 0.0 0.0 0.0
2016 6137 0.0 0.0 0.0
2017 264 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-28 No Incident Encountered 0.00 0.00
2014-01-11 No Incident Encountered 0.00 0.00
2016-10-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References