If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0816100907002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.007664,"lon":-119.467055,"icon":""}]} |
| Location: 00/07-09-081-10W6/2 | |
| Location Alias: 00/07-09-81-10 W6M | |
| Location Alias 2: 00/07-09-081-10 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 081 | |
| Meridian: 6 | |
| Range: 10 | |
| Section: 09 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE BONANZA 7-9-81-10 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0480014 | |
| License Date: 2016-08-03 | |
| License Status: Suspension | |
| Spud Date: 2016-08-28 | |
| Final Drill Date: 2016-09-11 | |
| Well Total Depth: 3520.00 m | |
| Surface Hole Latitude: 56.007664 | |
| Surface Hole Longitude: -119.467055 |
| Date | Event |
|---|---|
| 2016-08-03 | Obtained License |
| 2016-08-29 | Surface Casing Operation Performed |
| 2016-08-30 | Direction Drilling Operation Performed - Horizontal |
| 2016-09-01 | Well Log Performed |
| 2016-09-05 | Direction Drilling Operation Performed - Horizontal |
| 2016-09-06 | Intermediate Casing Operation Performed |
| 2016-09-11 | Finished Drilling |
| 2016-09-11 | Well Log Performed |
| 2016-09-11 | Well Mode changed to Drilled and Cased |
| 2016-09-12 | Liner Casing Operation Performed |
| 2016-09-13 | Rig Released |
| 2016-10-01 | Well Began Production |
| 2016-10-01 | Well Fluid changed to Crude Oil |
| 2016-10-01 | Well Mode changed to Pumping |
| 2016-10-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-10-31 | Well Fluid changed to Crude Oil |
| 2016-10-31 | Well Mode changed to Suspended |
| 2017-07-01 | Well Fluid changed to Crude Oil |
| 2017-07-01 | Well Mode changed to Pumping |
| 2019-05-31 | Well Fluid changed to Crude Oil |
| 2019-05-31 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-08-30 | 1186.10 | Horizontal |
| 2016-09-05 | 1689.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-10-06 | Multi-Stage Fracture | 3497.70 | 3497.80 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3074.00 | 3074.10 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3026.90 | 3027.00 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2979.80 | 2979.90 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2932.70 | 2932.80 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2885.60 | 2885.70 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2838.60 | 2838.70 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2791.50 | 2791.60 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2744.40 | 2744.50 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 2697.30 | 2697.40 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2650.20 | 2650.30 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3450.50 | 3450.60 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2461.60 | 2461.70 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2414.60 | 2414.70 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2367.40 | 2367.50 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2309.00 | 2309.10 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2250.40 | 2250.50 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2191.90 | 2192.00 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2133.50 | 2133.60 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2075.00 | 2075.10 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 2016.40 | 2016.50 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 1957.80 | 1957.90 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3403.60 | 3403.70 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 1899.30 | 1899.40 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 1840.60 | 1840.70 | 0 |
| 2016-10-07 | Multi-Stage Fracture | 1782.10 | 1782.20 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3356.40 | 3356.50 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3309.10 | 3309.20 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3262.10 | 3262.20 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3215.00 | 3215.10 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3168.00 | 3168.10 | 0 |
| 2016-10-06 | Multi-Stage Fracture | 3121.00 | 3121.10 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-10-06 | 2016-10-07 | 1,533 | 4,578 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 92.2327 | N/A | |||
| Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.2777 | N/A | ||
| Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.1109 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.1109 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.1109 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.1109 | N/A | ||||
| Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.2777 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.2777 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.2777 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.2776 | N/A | ||||
| AcResin Activator W | Canyon Technical Services | Activator | Alcohols. C12-14 Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0605 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0605 | N/A | ||||
| Polyethylene Glycol | 25322-68-3 | 100 | 0.0605 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.1041 | N/A | |
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0907 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0907 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0907 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0907 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0907 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0512 | N/A | |
| CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0355 | N/A | |
| Potassium Chloride | 7447-40-7 | 100 | 0.0355 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0355 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-10-06 | 2016-10-07 | Surface Water - Runoff | 4578 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 744 | 0.0 | 0.0 | 0.0 |
| 2017 | 151 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-10-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]