If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816121306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.024393,"lon":-119.737033,"icon":""}]} |
Location: 00/06-13-081-12W6/0 | |
Location Alias: 00/06-13-81-12 W6M | |
Location Alias 2: 00/06-13-081-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 12 | |
Section: 13 | |
County/Municipality: Saddle Hills County | |
Well Name: POCO POUCE COUPE 6-13-81-12 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0225130 | |
License Date: 1999-08-05 | |
License Status: Issued | |
Spud Date: 1999-08-20 | |
Final Drill Date: 1999-09-01 | |
Well Total Depth: 1775.00 m | |
Surface Hole Latitude: 56.024393 | |
Surface Hole Longitude: -119.737033 |
Date | Event |
---|---|
1999-08-05 | Obtained License |
1999-08-20 | Well Log Performed |
1999-08-22 | Surface Casing Operation Performed |
1999-08-24 | Direction Drilling Operation Performed - Deviate |
1999-09-01 | Finished Drilling |
1999-09-02 | Well Log Performed |
1999-09-03 | Production Casing Operation Performed |
1999-09-04 | Rig Released |
1999-09-04 | Well Mode changed to Drilled and Cased |
1999-09-19 | Well Log Performed |
1999-09-20 | Perforation Treatment Performed - Jet Perforation |
1999-09-20 | Well Log Performed |
1999-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-09-22 | Well Log Performed |
1999-09-24 | Perforation Treatment Performed - Fractured |
1999-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-27 | Plug Back Performed |
1999-09-27 | Well Log Performed |
1999-09-28 | Perforation Treatment Performed - Jet Perforation |
1999-09-28 | Well Log Performed |
1999-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-10-06 | Perforation Treatment Performed - Fractured |
2000-01-01 | Well Began Production |
2000-01-01 | Well Fluid changed to Crude Oil |
2000-01-01 | Well Mode changed to Pumping |
2006-10-01 | Well Fluid changed to Crude Oil |
2006-10-01 | Well Mode changed to Suspended |
2007-01-15 | Well Fluid changed to Crude Oil |
2007-01-15 | Well Mode changed to Pumping |
2008-05-29 | Well Log Performed |
2010-10-01 | Well Fluid changed to Crude Oil |
2010-10-01 | Well Mode changed to Suspended |
2011-10-26 | Well Fluid changed to Crude Oil |
2011-10-26 | Well Mode changed to Pumping |
2017-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-10-06 | Plug Back Performed |
2017-10-06 | Well Fluid changed to Crude Oil |
2017-10-06 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-08-24 | 650.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-20 | Perforation | 1661.00 | 1663.00 | 20 |
1999-09-21 | Acid Treatment | 1661.00 | 1663.00 | 0 |
1999-09-24 | Fracture | 1661.00 | 1663.00 | 0 |
1999-09-27 | Packing Device Capped w/Cement | 1647.00 | 1655.00 | 0 |
1999-09-28 | Perforation | 1562.00 | 1564.00 | 20 |
1999-09-30 | Acid Treatment | 1562.00 | 1564.00 | 0 |
1999-10-06 | Fracture | 1562.00 | 1564.00 | 0 |
2017-10-06 | Packing Device Capped w/Cement | 1548.00 | 1556.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 7702 | 0.0 | 0.0 | 0.0 |
2001 | 6477 | 0.0 | 0.0 | 0.0 |
2002 | 5593 | 0.0 | 0.0 | 0.0 |
2003 | 5662 | 0.0 | 0.0 | 0.0 |
2004 | 5729 | 0.0 | 0.0 | 0.0 |
2005 | 7650 | 0.0 | 0.0 | 0.0 |
2006 | 350 | 0.0 | 0.0 | 0.0 |
2007 | 7644 | 0.0 | 0.0 | 0.0 |
2008 | 4203 | 0.0 | 0.0 | 0.0 |
2009 | 2409 | 0.0 | 0.0 | 0.0 |
2010 | 4700 | 0.0 | 0.0 | 0.0 |
2011 | 1414 | 0.0 | 0.0 | 0.0 |
2012 | 8544 | 0.0 | 0.0 | 0.0 |
2013 | 8401 | 0.0 | 0.0 | 0.0 |
2014 | 8408 | 0.0 | 0.0 | 0.0 |
2015 | 7989 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]