X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816122210000

Well Details

Well ID: 0816122210000
Loading map...
Location: 00/10-22-081-12W6/0
Location Alias: 00/10-22-81-12 W6M
Location Alias 2: 00/10-22-081-12 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 12
Section: 22
County/Municipality: Saddle Hills County
Well Name: BURLINGTON ET AL BONANZA 10-22-81-12
Operator Name: Shoreline Energy Corp.
License Number: 0243536
License Date: 2000-10-24
License Status: Abandoned
Spud Date: 2000-12-10
Final Drill Date: 2000-12-19
Well Total Depth: 1681.00 m
Surface Hole Latitude: 56.036648
Surface Hole Longitude: -119.784687

For data sources see[1][2]

Well History

Date Event
2000-10-24 Obtained License
2000-12-12 Surface Casing Operation Performed
2000-12-15 Direction Drilling Operation Performed - Deviate
2000-12-19 Finished Drilling
2000-12-19 Well Log Performed
2000-12-22 Production Casing Operation Performed
2000-12-23 Rig Released
2000-12-23 Well Mode changed to Drilled and Cased
2001-01-11 Perforation Treatment Performed - Jet Perforation
2001-01-11 Well Log Performed
2001-01-12 Well Log Performed
2001-01-16 Perforation Treatment Performed - Jet Perforation
2001-01-16 Well Log Performed
2001-01-24 Perforation Treatment Performed - Fractured
2001-08-17 Well Began Production
2001-08-17 Well Fluid changed to Gas
2001-08-17 Well Mode changed to Flowing
2003-12-11 Perforation Treatment Performed - Jet Perforation
2004-04-30 Well Fluid changed to Gas
2004-04-30 Well Mode changed to Pumping
2017-08-08 Well Log Performed
2017-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-09 Plug Back Performed
2017-08-09 Well Fluid changed to Gas
2017-08-09 Well Log Performed
2017-08-09 Well Mode changed to Abandoned Zone
2017-08-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-12-15 1135.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-11 Perforation 1585.00 1590.00 17
2001-01-16 Perforation 1591.00 1595.00 17
2001-01-24 Fracture 1585.00 1595.00 0
2003-12-11 Perforation 1570.00 1571.00 20
2017-08-09 Packing Device Capped w/Cement 1570.40 1578.40 0
2017-08-09 Packing Device Capped w/Cement 1557.00 1565.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2156 0.0 0.0 0.0
2002 6237 0.0 0.0 0.0
2003 7953 0.0 0.0 0.0
2004 8682 0.0 0.0 0.0
2005 8091 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7775 0.0 0.0 0.0
2008 6768 0.0 0.0 0.0
2009 4295 0.0 0.0 0.0
2010 7272 0.0 0.0 0.0
2011 7816 0.0 0.0 0.0
2012 8399 0.0 0.0 0.0
2013 8640 0.0 0.0 0.0
2014 8137 0.0 0.0 0.0
2015 2088 0.0 0.0 0.0

For data sources see[6]

References