X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0825040604000

Well Details

Well ID: 0825040604000
Loading map...
Location: 00/04-06-082-04W5/0
Location Alias: 00/04-06-82-04 W5M
Location Alias 2: 00/04-06-082-04 W5/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 5
Range: 04
Section: 06
County/Municipality: Municipal District of Opportunity No. 17
Well Name: TURNSTONE HZ GODIN 4-6-82-4
Operator Name: Turnstone Energy Inc.
License Number: 0494218
License Date: 2019-04-17
License Status: Amended
Spud Date: 2019-08-22
Final Drill Date: 2019-08-29
Well Total Depth: 2060.00 m
Surface Hole Latitude: 56.088974
Surface Hole Longitude: -114.624450

For data sources see[1][2]

Well History

Date Event
2019-04-17 Obtained License
2019-08-22 Drill To LD
2019-08-23 Direction Drilling Operation Performed - Deviate
2019-08-23 Surface Casing Operation Performed
2019-08-24 Direction Drilling Operation Performed - Horizontal
2019-08-24 Well Log Performed
2019-08-25 Intermediate Casing Operation Performed
2019-08-29 Finished Drilling
2019-08-29 Well Log Performed
2019-09-01 Perforation Treatment Performed - Open-Hole Completion
2019-09-01 Well Mode changed to Drilled and Cased
2019-09-02 Rig Released
2019-09-18 Well Began Production
2019-09-18 Well Fluid changed to Crude Oil
2019-09-18 Well Mode changed to Pumping
2020-01-01 Well Fluid changed to Crude Oil
2020-01-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-22 Precision Drilling Corporation 299 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-08-23 180.60 Deviate (5 - 79 degrees)
2019-08-24 587.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-01 Open Hole/Barefoot Completion 668.00 2060.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 365 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-01 No Incident Encountered 0.00 0.00
2019-09-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References