X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0825253001000

Well Details

Well ID: 0825253001000
Loading map...
Location: 00/01-30-082-25W5/0
Location Alias: 00/01-30-82-25 W5M
Location Alias 2: 00/01-30-082-25 W5/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 5
Range: 25
Section: 30
County/Municipality: Municipal District of Peace No. 135
Well Name: PETRUS HZ BERWYN 1-30-82-25
Operator Name: Rising Star Resources Ltd.
License Number: 0449193
License Date: 2012-10-15
License Status: Abandoned
Spud Date: 2012-10-25
Final Drill Date: 2012-11-07
Well Total Depth: 2433.00 m
Surface Hole Latitude: 56.145822
Surface Hole Longitude: -117.893107

For data sources see[1][2]

Well History

Date Event
2012-10-15 Obtained License
2012-10-27 Surface Casing Operation Performed
2012-10-28 Direction Drilling Operation Performed - Deviate
2012-10-29 Direction Drilling Operation Performed - Horizontal
2012-10-31 Intermediate Casing Operation Performed
2012-11-06 Production Casing Operation Performed
2012-11-07 Finished Drilling
2012-11-07 Rig Released
2012-11-07 Well Mode changed to Drilled and Cased
2012-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-27 Perforation Treatment Performed - Cement Plug
2015-11-27 Plug Back Performed
2015-11-27 Well Mode changed to Abandoned Zone
2015-11-29 Well Abandoned
2015-11-29 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-25 Horizon Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-28 640.00 Deviate (5 - 79 degrees)
2012-10-29 830.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-21 Multi-Stage Fracture 2391.60 2392.10 0
2012-11-21 Multi-Stage Fracture 1511.30 1511.80 0
2012-11-21 Multi-Stage Fracture 1428.00 1428.50 0
2012-11-21 Multi-Stage Fracture 1345.30 1345.80 0
2012-11-21 Multi-Stage Fracture 1261.80 1262.30 0
2012-11-21 Multi-Stage Fracture 1178.10 1178.50 0
2015-11-27 Cement Plug 1015.00 1079.00 0
2012-11-21 Multi-Stage Fracture 2321.50 2322.00 0
2012-11-21 Multi-Stage Fracture 2224.70 2225.20 0
2012-11-21 Multi-Stage Fracture 2141.10 2141.60 0
2012-11-21 Multi-Stage Fracture 2046.10 2046.60 0
2012-11-21 Multi-Stage Fracture 1949.20 1949.70 0
2012-11-21 Multi-Stage Fracture 1852.70 1853.20 0
2012-11-21 Multi-Stage Fracture 1663.60 1664.10 0
2012-11-21 Multi-Stage Fracture 1594.20 1594.70 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-07 No Incident Encountered 0.00 0.00
2012-11-21 No Incident Encountered 0.00 0.00
2015-11-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References