X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0825253305000

Well Details

Well ID: 0825253305000
Loading map...
Location: 00/05-33-082-25W5/0
Location Alias: 00/05-33-82-25 W5M
Location Alias 2: 00/05-33-082-25 W5/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 5
Range: 25
Section: 33
County/Municipality: Municipal District of Peace No. 135
Well Name: DEVON NEC BERWYN 5-33-82-25
Operator Name: Devon Canada Corporation
License Number: 0216397
License Date: 1998-07-09
License Status: RecCertified
Spud Date: 1998-07-28
Final Drill Date: 1998-07-31
Well Total Depth: 1064.00 m
Surface Hole Latitude: 56.152005
Surface Hole Longitude: -117.857814

For data sources see[1][2]

Well History

Date Event
1998-07-09 Obtained License
1998-07-28 Surface Casing Operation Performed
1998-07-31 Finished Drilling
1998-07-31 Well Log Performed
1998-08-01 Well Log Performed
1998-08-02 Drill Stem Test Performed
1998-08-03 Production Casing Operation Performed
1998-08-04 Rig Released
1998-08-04 Well Mode changed to Drilled and Cased
2004-07-22 Well Log Performed
2004-07-25 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-26 Perforation Treatment Performed - Remedial Casing
2004-07-26 Well Log Performed
2004-07-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-07-27 Perforation Treatment Performed - Jet Perforation
2004-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-28 Perforation Treatment Performed - Remedial Casing
2004-07-29 Well Abandoned
2004-07-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-25 Hydra Jet Perforation 901.50 902.00 13
2004-07-26 Remedial Casing Cementing 901.50 902.00 0
2004-07-26 Packing Device Capped w/Cement 882.90 920.00 0
2004-07-27 Perforation 865.00 865.20 2
2004-07-27 Hydra Jet Perforation 801.50 802.00 13
2004-07-28 Remedial Casing Cementing 801.50 802.00 0
2004-07-28 Packing Device Capped w/Cement 704.50 817.00 0

For data sources see[4]



References