If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0826010504005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.074785,"lon":-118.124354,"icon":""}]} |
Location: 00/04-05-082-01W6/5 | |
Location Alias: 00/04-05-82-01 W6M | |
Location Alias 2: 00/04-05-082-01 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 6 | |
Range: 01 | |
Section: 05 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: ADAMANT WHITELAW 4-5-82-1 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0378373 | |
License Date: 2007-06-20 | |
License Status: Suspension | |
Spud Date: 2007-06-25 | |
Final Drill Date: 2007-06-28 | |
Well Total Depth: 1065.00 m | |
Surface Hole Latitude: 56.074785 | |
Surface Hole Longitude: -118.124354 |
Date | Event |
---|---|
2007-06-20 | Obtained License |
2007-06-26 | Surface Casing Operation Performed |
2007-06-28 | Finished Drilling |
2007-06-28 | Well Mode changed to Drilled and Cased |
2007-06-29 | Well Log Performed |
2007-06-30 | Drill Stem Test Performed |
2007-06-30 | Well Log Performed |
2007-07-01 | Production Casing Operation Performed |
2007-07-01 | Rig Released |
2007-07-10 | Perforation Treatment Performed - Jet Perforation |
2011-07-01 | Well Log Performed |
2011-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-07-02 | Perforation Treatment Performed - Jet Perforation |
2011-07-02 | Plug Back Performed |
2011-07-02 | Well Log Performed |
2011-07-20 | Perforation Treatment Performed - Jet Perforation |
2011-07-20 | Well Log Performed |
2011-08-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-07-10 | Perforation | 899.00 | 901.50 | 17 |
2007-07-10 | Perforation | 874.00 | 876.00 | 17 |
2007-07-10 | Perforation | 451.50 | 452.50 | 17 |
2011-07-02 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2011-07-02 | Perforation | 848.00 | 853.00 | 17 |
2011-07-20 | Perforation | 731.00 | 733.50 | 17 |
2011-07-20 | Perforation | 669.00 | 702.50 | 17 |
For data sources see[4]