X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826020102000

Well Details

Well ID: 0826020102000
Loading map...
Location: 00/02-01-082-02W6/0
Location Alias: 00/02-01-82-02 W6M
Location Alias 2: 00/02-01-082-02 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 01
County/Municipality: Municipal District of Fairview No. 136
Well Name: AMOCO WHITELAW 2-1-82-2
Operator Name: BP Canada Energy Group ULC
License Number: 0114192
License Date: 1985-04-10
License Status: RecCertified
Spud Date: 1985-04-10
Final Drill Date: 1985-04-28
Well Total Depth: 2211.00 m
Surface Hole Latitude: 56.073383
Surface Hole Longitude: -118.169919

For data sources see[1][2]

Well History

Date Event
1985-04-10 Obtained License
1985-04-12 Surface Casing Operation Performed
1985-04-27 Lost Circulation Occurred
1985-04-28 Finished Drilling
1985-04-29 Well Log Performed
1985-04-30 Drill Stem Test Performed
1985-05-01 Drill Stem Test Performed
1985-05-02 Drill Stem Test Performed
1985-05-04 Plug Back Performed
1985-05-04 Well Log Performed
1985-05-05 Production Casing Operation Performed
1985-05-05 Rig Released
1985-06-05 Perforation Treatment Performed - Jet Perforation
1985-06-05 Well Log Performed
1985-06-07 Perforation Treatment Performed - Jet Perforation
1985-06-07 Well Log Performed
1985-06-08 Perforation Treatment Performed - Cement Squeeze
1985-06-10 Perforation Treatment Performed - Jet Perforation
1985-06-10 Well Log Performed
1985-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-12 Well Mode changed to Drilled and Cased
1992-09-09 Well Abandoned
1992-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-05 Perforation 900.00 904.00 13
1985-06-07 Perforation 908.50 909.00 13
1985-06-08 Cement Squeeze 900.00 909.00 0
1985-06-10 Perforation 900.50 902.50 13
1985-06-12 Packing Device Capped w/Cement 889.00 897.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-04-27 Lost Circulation 2145.00 2195.00

For data sources see[5]

References