X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826020106000

Well Details

Well ID: 0826020106000
Loading map...
Location: 00/06-01-082-02W6/0
Location Alias: 00/06-01-82-02 W6M
Location Alias 2: 00/06-01-082-02 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 01
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL WHITELAW 6-1-82-2
Operator Name: Canadian Natural Resources Limited
License Number: 0018105
License Date: 1959-11-13
License Status: RecCertified
Spud Date: 1959-11-23
Final Drill Date: 1959-12-01
Well Total Depth: 1030.20 m
Surface Hole Latitude: 56.078111
Surface Hole Longitude: -118.173290

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-13 Obtained License
1959-12-01 Finished Drilling
1959-12-01 Production Casing Operation Performed
1959-12-06 Perforation Treatment Performed - Jet Perforation
1959-12-08 Well Mode changed to Drilled and Cased
1960-01-23 Well Began Production
1960-01-23 Well Fluid changed to Gas
1960-01-23 Well Mode changed to Flowing
1981-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-18 Well Fluid changed to Gas
1981-09-18 Well Mode changed to Abandoned Zone
1981-09-21 Perforation Treatment Performed - Cement Squeeze
1981-09-21 Perforation Treatment Performed - Jet Perforation
1981-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-25 Perforation Treatment Performed - Jet Perforation
1981-09-28 Perforation Treatment Performed - Cement Squeeze
1981-09-28 Perforation Treatment Performed - Jet Perforation
1981-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-29 Perforation Treatment Performed - Jet Perforation
1991-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-17 Perforation Treatment Performed - Jet Perforation
1991-07-17 Plug Back Performed
1991-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-18 Perforation Treatment Performed - Remedial Casing
1991-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-06 Perforation 883.30 887.00 13
1981-09-29 Packing Device Capped w/Cement 725.00 725.00 0
1981-09-29 Perforation 698.00 701.00 13
1991-07-17 Packing Device Capped w/Cement 682.00 690.00 0
1991-07-17 Perforation 201.00 202.00 13
1991-07-18 Remedial Casing Cementing 201.00 202.00 0
1991-07-18 Packing Device Capped w/Cement 182.00 190.00 0
1981-09-18 Packing Device Capped w/Cement 882.00 882.00 0
1981-09-21 Perforation 867.50 870.50 6
1981-09-21 Cement Squeeze 867.50 870.50 0
1981-09-25 Perforation 872.00 875.00 13
1981-09-25 Acid Treatment 872.00 875.00 0
1981-09-28 Cement Squeeze 872.00 875.00 0
1981-09-28 Perforation 747.00 749.50 13
1981-09-28 Perforation 732.00 737.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References